pricing a job up this morning, wants it done by next friday. wants cu moved to hall downstairs with meter explained i can't move meter or supply but he still wanted quote.
all the electrics comming down 3 metre walls in pvc trunking he wants them sunk and back boxes sunk, looked at cu and electrics and all looks new brought meter to test cu but no ladders!!
it's a flat the size of a three bed house as loft has been converted.
i imagine if all tests out ok i could complete rings at original cu and break rings closer to new cu and extend cable taking into account vd length of run etc.
how would you price this as a rewire incase issues or as a partial rewire, i meen adding cost of cable in case?
 
ANY pricing boils down to the same old formula.... ab+c+d.......(how long you reckon it will take you to do it) x (your hourly rate) + (cost of any materials) + (any other on costs) = the bill.

If that isn't competitive then either 1) work faster or 2) work cheaper if you can.
 
guy changed his mind wants cu left where it is, also wants a plasterer so ok i have a very cheap labourer and plasterer linned up so bill doesn't look that bad now. also i won't be breaking my back chasing walls.
 