glbell

I have a 4KW Canadian Solar with a 3.8 centrosolar inverter. I managed to install it mid Feb'12 just as the 43p rate was coming to an end.
So if I wanted to extend to 6KW (ignoring the DNO point for a sec) I have few questions I keep getting varied answers to
- what rate would I get on existing 4wk & "new" 2kw
- Whats the most sensible installation option - install as a 2kw with a 2kw inverter or get a 6kw inverter and replace the existing 3.8 ?
- Now the DNO question, how can I find out if the 6Kw is acceptable to Scottish power (I have very little electrical knowledge) - do they just come and survey the property, cabling and loads ?

thanks Graeme.
 
I have a 4KW Canadian Solar with a 3.8 centrosolar inverter. I managed to install it mid Feb'12 just as the 43p rate was coming to an end.
So if I wanted to extend to 6KW (ignoring the DNO point for a sec) I have few questions I keep getting varied answers to
- what rate would I get on existing 4wk & "new" 2kw
- Whats the most sensible installation option - install as a 2kw with a 2kw inverter or get a 6kw inverter and replace the existing 3.8 ?
- Now the DNO question, how can I find out if the 6Kw is acceptable to Scottish power (I have very little electrical knowledge) - do they just come and survey the property, cabling and loads ?

thanks Graeme.


Hi I would not interfere with your existing 4Kwp System as it is registered with you FIT provider and at the Higher rate 43p.

It is much better to install the new 2kw system along side what you have together with its own self generation meter and register it as an extension,
That way your original system A will be generating at 43p ( its no 46.81 ) and remain unaffected

Your 2Kwp extension will be generating at 13.99p as you are over 4Kwp and less than 10Kwp.

You will just have two FIT meter readings to send in.


How ever you will need permission first from your DNO to see if you can connect the additional 2Kwp to their Network, via a G59 ENA Application
 

Reply to PV 6KW domestic in the Solar PV Forum | Solar Panels Forum area at ElectriciansForums.net

Similar Threads

Hi all, Testing question for you. I'm currently testing an existing domestic installation. The wiring is about 20-25 years old. We have rewired...
Replies
7
Views
1K
V.early days, just had installed solar. No battery, also supply of some parts difficult at the moment so no App or Online monitoring. I have a...
Replies
3
Views
3K
Hi Guys I've fitted a few emergency lighting circuits to both domestic and commercial installs before, I've come across one I can't get my head...
Replies
19
Views
1K
Hi all, total newbie to the forum. I sincerely hope that those in the know-how would be able to assist me. On my semi-detached house we have an...
Replies
13
Views
2K
Hi All, I have a client who is developing a plot of land for a single house. Currently, their 100 amp service cut-out is in a cubicle fed by...
Replies
7
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock