I agree entirely that falling back on RCD's to correct for poor design just isn't what it's about.
However....I'm going to make a half stand for the OP here: Who's actual design IS this? His, or the engineers? Given that .7 Ohms isn't that long a length of cable (esp in a radial), has someone just not measured their runs properly on the original spec?? That old chestnut of 'Cant do it to the plan as some builder has stuck a joist in the way', etc, can soon add up. Did someone just put 2.5mm down without thinking when it should have been 4mm? And so on.
But, if the OP has had free reign on design and install and no 3rd party design then sorry mate - prepare to be boarded!
However....I'm going to make a half stand for the OP here: Who's actual design IS this? His, or the engineers? Given that .7 Ohms isn't that long a length of cable (esp in a radial), has someone just not measured their runs properly on the original spec?? That old chestnut of 'Cant do it to the plan as some builder has stuck a joist in the way', etc, can soon add up. Did someone just put 2.5mm down without thinking when it should have been 4mm? And so on.
But, if the OP has had free reign on design and install and no 3rd party design then sorry mate - prepare to be boarded!