M
mikey12
Hi all need help could someone please advise me as im soon going to register with governing body like to do my homework first ive got c/u change lined up for my major job to be inspected what im not sure about is do i inform local building control before commencing this or do i change c/u and just contact governing body when complete to register as my assesment job also am i right in saying that if i install a split board c/u 100a main switch with 2 rcds 30ma protecting all circuits and single rcbo on smokes if connected to c/u and a seperate main switch is this permitted according to 17th regs i may not have got all this right so please feel free to correct me
Last edited by a moderator: