Read post 13 and tell me what you mean

Full time job say maintenance electrician, guess mean industrial
So wounder whom they are sending the cert with
As I didn't think would be insured and reg to do domestic for a part time thing
 
Full time job say maintenance electrician, guess mean industrial
So wounder whom they are sending the cert with
As I didn't think would be insured and reg to do domestic for a part time thing

Ah ha. You are suggesting the op is working on the side.
 
Yeah , ive done nvq , test and inspec , 17th and am2 just not done much house bashing, mainly industrial and commercial
why not use a lucy glandplate then you can use an offcut of swa from work instead of tails, will save you some money

Sent from my SM-G900F using Tapatalk
 
Some DNO's get funny about you installing your own equipment within the meter cabinet/box but on the other hand they don't want you relying on their fuse for OCP for your distribution circuit..I would install a switch fuse within the cabinet/box with no qualms.
 
Yeah , ive done nvq , test and inspec , 17th and am2 just not done much house bashing, mainly industrial and commercial

So you'll be familiar with Amendment 3 requirements for consumer units & similar switchgear??



Sent from my iPhone using Tapatalk
 