If there are only 10A and 16A breakers its not correct under ITC-BT 25 of the regs if its a small install there should be Example 25 amp main switch 25A 30ma RCD. 25 A breaker Cooker circuit 6mm cable, 20A breaker 4mm cable (hot water heater) 16A 2.5mm cable breaker Sockets, 16A 2.5mm cable, Sockets, 10 A Lighting circuit 1.5mm cable. there should also be a breaker called an ICP the size of that will depend on the supply contracted. Why does it make you cringe ? better than a ring IMO. The work will need to be tested and a Bolitin issued. Zones apply in both bathrooms and the kitchen as do socket and switch heights. Dont get caught.
 
If there are only 10A and 16A breakers its not correct under ITC-BT 25 of the regs if its a small install there should be Example 25 amp main switch 25A 30ma RCD. 25 A breaker Cooker circuit 6mm cable, 20A breaker 4mm cable (hot water heater) 16A 2.5mm cable breaker Sockets, 16A 2.5mm cable, Sockets, 10 A Lighting circuit 1.5mm cable. there should also be a breaker called an ICP the size of that will depend on the supply contracted. Why does it make you cringe ? better than a ring IMO. The work will need to be tested and a Bolitin issued. Zones apply in both bathrooms and the kitchen as do socket and switch heights. Dont get caught.

Nope, i wouldn't go a far as that!! lol!!

The OP's installation might be quite old, and many older Spanish installations weren't up to much in those day's. From what i've seen for myself, the new installations are a far cry from what was once seen/allowed in day's gone by...
 
If there are only 10A and 16A breakers its not correct under ITC-BT 25 of the regs if its a small install there should be Example 25 amp main switch 25A 30ma RCD. 25 A breaker Cooker circuit 6mm cable, 20A breaker 4mm cable (hot water heater) 16A 2.5mm cable breaker Sockets, 16A 2.5mm cable, Sockets, 10 A Lighting circuit 1.5mm cable. there should also be a breaker called an ICP the size of that will depend on the supply contracted. Why does it make you cringe ? better than a ring IMO. The work will need to be tested and a Bolitin issued. Zones apply in both bathrooms and the kitchen as do socket and switch heights. Dont get caught.


Is that the Single/3 phase MCCB after the supply meter, that incorporates a 500mA earth fault protection element??
 
Is that the Single/3 phase MCCB after the supply meter, that incorporates a 500mA earth fault protection element??

Hi Eng. The ICP is just a 1 or 3 pole MCB, no earth fault protection and it belongs to the Dno. It normally fits in its own enclosure, or an enclosure within a panel that can be lead sealed. Limits the supply into the property as Gary explained.
 
It normally fits in its own enclosure, or an enclosure within a panel that can be lead sealed. Limits the supply into the property as Gary explained.

In the unfortunate instance of 'popping' it can you (the householder) reset it or is it a call-out of the electric company. I guess someone like ENDESA?
 
It can be reset by the customer, the idea of them is that if you contract with say, Endesa, for a 25A supply at the appropriate tariff, then they fit a 25A ICP Breaker, if you have to keep resetting because you need a bigger supply then you would need to go back to them, sign a contract for a bigger supply at a higher tariff, and they would come back - fit a larger ICP.

With the housing boom in Spain over the last few years, demand for supply has outstripped the ability of the supply infrastructure to keep up, so the Supply Authorities are desperate to keep supply size to a minimum, 25A supply into a 2 bedroom house is normal.
 
Do you get any Blackouts in Spain?
I saw the CEO (or whoever) of one of the British Power suppliers on 'Hard Talk' the other day, and he was saying that BOs are a serious possibility soon in the UK. The amount of slack in the system is at an all time low.
Previous Govt's not investing in new generation, so now we're tied into an expensive foreign solution! :censored::mad2:
 
Yeah do get quite a few Archy, don't know much about Spanish generating capabilities if I'm honest, I expect they are tied in to a European grid because they don't seem to suffer from a lack of capacity, more like the outages are caused by network breakdowns, especially when it rains and the manholes, where they make all the joints in the street, fill up with water. Everything is overloaded so a lot of failures because of this.
 
There is a Spanish lad on my 17th Edition course and he explained the "octopus" system to me. When he was looking at the demo baords in the college and saw each circuit wired back to the CU without aforementioned boxes he just muttered something about it being much harder to find / fix faults! He's a good hand too, explained his training as a spark over there and its a different but yet comprehensive training, like my apprenticeship, just different.
 
Wow that's quite a bang! 70's blackouts, remember them, had to go on a 3 day week for a bit. They have individual blackouts here too. When the bill hasn't been paid they just come along and whip the meter away, no advance notice. been called out many times to that one.
 
Meter pulling is probably a good idea!
I make the mistake of leaving the bills to our lass. She racked up such a huge electric bill (DON'T ask!!!), they put a pre-payment meter in.
I quite like it actually. I now know how much electric we use, 2 adults 3 girls, everything switched on, comes in about a tenner/week.
Worked it out a while back on here, it's about an average of < 3 or 4A over 12 hours.
That's why them threads about do I need a 3 phase, 600A supply for a small block of flats amuse me!
 
It may seem like a good idea Archy, but the aggro you have to go through to get your meter back is tremendous - and it takes about a week!
 
Hi Eng. The ICP is just a 1 or 3 pole MCB, no earth fault protection and it belongs to the Dno. It normally fits in its own enclosure, or an enclosure within a panel that can be lead sealed. Limits the supply into the property as Gary explained.

Ok i'm with you. Just wondered if it was similar to other European countries that use the MCCB i described above. We also use them in Cyprus. They mostly come adjustable from 20A to 60A with a fixed 500mA RCD element.


Are most Spanish installations still on TT earthing, or increasing the PME supplies available?? Cyprus is around 90/95% TT and can't really see that changing anytime soon.
 
It may seem like a good idea Archy, but the aggro you have to go through to get your meter back is tremendous - and it takes about a week!

Hahahahaha...I don't need to worry about that for a while.
The debt is being paid off at £10 a week.
Everyone will have their own miniature Fusion reactor by then!
 

OFFICIAL SPONSORS

Back
Top