Or have you been snowed in, and got no beer :)
Been holed up with trageminal neuralgia apparently the worse pain known also referred to as the suicide pain, thank you to my docs for making it to the surgery today so your post gave me a right chuckle:D
 
Most of them, so long as the back box is deep enough.

Edit:-

40mm minimum to give yourself some wiggle room with the conductors.

Not sure about conduit connections... if you're talking conduit you'll probably have to carefully cut holes in the patress box. If you're actually meaning trunking, then the entry points will be plenty big enough. Some boxes even include cable clamps.

To avoid breaking the plastic boxes, cut the entry points with a junior hacksaw first, then break them out and clean up the edges with a file to prevent damage to the cable.

Further edit:-

And as it's a new circuit, it goes without saying it will need properly testing, an EIC and a building control notification. Depending on the size of the load, you may also want to consider the loading etc. in the consumer unit.
Hi Sparky,

I did actually mean trunking and not conduit sorry my bad!

Your info was much appreciated, thanks
 
Hi GK - you might like to get yourself updated to Trainee, which is you if I recall correctly :)
Hi Wilko,

Apparently to do that I have to be able to show I am currently on a course which im not. TBH im happy to be called whatever (within reason lol) as long as im able to use the site and knowledge of those wiser which comes in very useful!
 
My gosh I really confused thinks with my op calling it conduit and not trunking, my bad!!!

Forgive me please oh great ones lol
 

OFFICIAL SPONSORS

Back
Top