The OP talks of extending the tails up to around 10m and bringing into the new loft. I think most sparks would be looking at a different cabling solution than 6181Y over that distance, and also be considering mechanical protection regardless of whether it's technically required or not, especially if there is building work in the vicinity. Cost wise there's only a few quid in it either way, so why try so hard to NOT do the job to the higher spec??

Ok, I read it differently. I thought he said the existing tails were over 10m long and that he would need to reroute them because of a loft extension. If re-route means extend them, put them somewhere dodgy or replace them then I agree that SWA would be a better bet.
 
Im not going to be extending the tails by 10m, they already are 10m, I was want to just making sure that what was in place was acceptable (I just need to re route them around the new room in the loft so maybe extending them by a few meters)
The tails are already in the loft from the isolating switch in the garage. the incoming point and the new cu are not changing position. I just want to move the cables in a more convenient position.

Thanks for all your input guys
 