B
brman
The OP talks of extending the tails up to around 10m and bringing into the new loft. I think most sparks would be looking at a different cabling solution than 6181Y over that distance, and also be considering mechanical protection regardless of whether it's technically required or not, especially if there is building work in the vicinity. Cost wise there's only a few quid in it either way, so why try so hard to NOT do the job to the higher spec??
Ok, I read it differently. I thought he said the existing tails were over 10m long and that he would need to reroute them because of a loft extension. If re-route means extend them, put them somewhere dodgy or replace them then I agree that SWA would be a better bet.