Currently reading:
Terminating SWA with Wylex REC Supply Isolators

Discuss Terminating SWA with Wylex REC Supply Isolators in the UK Electrical Forum area at ElectriciansForums.net

Reaction score
88
I need to terminate 16mm SWA 2 core cable in Wylex REC Supply Isolators. Going to be using armour for earth. Whats the best thing to do with the earth. I have 12 of these to install. The only idea I have is to terminate armour on steel trunking then run 2 cores into Wylex REC Supply Isolators. Lastly connect earth back to intake. I'm sure there is a better way, I dont want to use steel trunking unless I have to?

See link below for Wylex REC Supply Isolators
http://www.tlc-direct.co.uk/Technical/DataSheets/Wylex/WYREC2.pdf
 
as mentioned in my last post would it not be easier to use metal clad 2 module enclosure and fit main switch in it can gland swa straight into it no need for adaptable box

Our posts crossed, but don't forget this is coming out of my pockets, 12 No. 2 module enclosures = expensive, 1 No. 25mm core drill = cheap(skate) :)

Someone tell me the link I sent is wrong.................................
 
What is it that you're actually trying to achieve here? What's the project?
 
What is it that you're actually trying to achieve here? What's the project?

12 No. new CU's for Bedsits. Everything is electric, no gas. Looking to keep costs down. Got some good advice in another post. Most cost effective option is SWA, but dilema is CPC.
If I can get 2 core in 20mm KO's I'm fine. If not it looks like I can't get off the shelf so will need to buy Adaptable box and drill my own, along with metal CU. Unless I can put 2 core in 32mm KO ?
 
why the hell are you faffing about with adaptable boxes and these switches ? ?!?!?

might as well just get the Wylex 110m range of switches ! easy to terminate 25mm SWA and the like.

WY110M.JPG
no messing about !!!

dont you need to fuse these SWA submains anyway ? or are they all ready suitably fused upstream ?
 
Last edited by a moderator:
why the hell are you faffing about with adaptable boxes and these switches ? ?!?!?

might as well just get the Wylex 110m range of switches ! easy to terminate 25mm SWA and the like.

View attachment 17500
no messing about !!!

dont you need to fuse these SWA submains anyway ? or are they all ready suitably fused upstream ?

Nice soloution, but 12 No. Wylex 110M = about £800
If it was only for one or two, I would go for this.
 
Nice soloution, but 12 No. Wylex 110M = about £800
If it was only for one or two, I would go for this.

you will save time and its a much neater job.

get a quote from a wholesalers, they will do a better price on 12

- - - Updated - - -

Got job lot, all brand new.

fair do's

- - - Updated - - -

and i ask again.. dont you need to fuse these submains ?
 

Reply to Terminating SWA with Wylex REC Supply Isolators in the UK Electrical Forum area at ElectriciansForums.net

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top