Does anyone have a quicker or safer way to eliminate the problems caused by neon switched sockets or dual pole switches etc, while running the schedule of tests on a ring or radial circuit. I would think the best way to eliminate the effects caused by the neons on the test results is to disconnect the fitting with the neon completely and replace it with chock block for the dutration of the tests, or is there a better way?..