O
Octopus
Well, I've put my name to a MWC where I added an outside light where no bonding was in place. Discussed and agreed with client and stated as so on the MWC.
And before I get shot down their kitchen refit was being done 3 months later and then the runs to the water and gas could be done without running 10mm GY around their dining room.
Jonny down the pub doesn't know about bonding, nor does Dave the builder, but we do and thus are in a position to make a qualified judgement based on knowledge and experience.
Tin hat on, bunker ready and as its Friday night bottle of red wine at the ready.
And before I get shot down their kitchen refit was being done 3 months later and then the runs to the water and gas could be done without running 10mm GY around their dining room.
Jonny down the pub doesn't know about bonding, nor does Dave the builder, but we do and thus are in a position to make a qualified judgement based on knowledge and experience.
Tin hat on, bunker ready and as its Friday night bottle of red wine at the ready.