Well, I've put my name to a MWC where I added an outside light where no bonding was in place. Discussed and agreed with client and stated as so on the MWC.

And before I get shot down their kitchen refit was being done 3 months later and then the runs to the water and gas could be done without running 10mm GY around their dining room.

Jonny down the pub doesn't know about bonding, nor does Dave the builder, but we do and thus are in a position to make a qualified judgement based on knowledge and experience.

Tin hat on, bunker ready and as its Friday night bottle of red wine at the ready.
 
the whole no bond no job diktat is guidance from the schemes , not bs7671.
so theres nothing stopping you from doing the work and recording the lack of bonding on the cert.
you , as the professional , have informed the client of this defect , job done , all nice and above board.
just thought id throw that in.
;-)
 
Agree with Murdoch on this one. It can be done as long as its recorded on the minor works certificate and that you've noted that you've informed the customer actually had this conversation yesterday with the Nic inspector
 
you guys check if bondings done before fitting a lights /replacing tranny/socket etc ?
 
OK, imagine this scenario. family with young kids, broken socket (wherever) where the kids can access it. no bonding. what do you do if the customer can't afford to have the bonding done?

1. walk away. 2. replace socket and point out the lasck of bonding and the danger involved. 3. spend 2-3 hours doing the bonding for free.
 
OK, imagine this scenario. family with young kids, broken socket (wherever) where the kids can access it. no bonding. what do you do if the customer can't afford to have the bonding done?

1. walk away. 2. replace socket 3. spend 2-3 hours doing the bonding for free.

#2 now edited.

I sorry but I simply don't believe people go round checking bonding when doing like for like repairs
 