Thoughts of experts welcome. The first smart meter installer walked away as he wasn't three-phase qualified but i'm wondering whether we should get Western Power out beforehand or whether any other work would be recommended. Not sure what the supply box on the right is feeding and I think Noah was the last person to inspect the meter. M
 

Attachments

  • IMG_0172.JPG
    425.6 KB · Views: 61
  • IMG_0173.JPG
    446.8 KB · Views: 67
  • IMG_0174.JPG
    684.4 KB · Views: 67
  • IMG_0175.JPG
    521.1 KB · Views: 64
  • IMG_0176.JPG
    501 KB · Views: 60
you need a wildlife expert first. can't disturb the spiders' natural habitat.
 
There's nothing there that Western Power are responsible for that needs any attention.

A bit of a dust over to clear the webs and spiders and as Tel, it may need permits, wildlife study, safe location to remove the spiders to etc.

It should be a straight forward exchange, a new 2 rate 3 phase meter and scrap the timeswitch, spiders permitting.
 
It isn't ancient. The corroded switch fuse may be redundant as it has three fuses sitting on top and evidence of a disconnected cable although it is still switched on. The newer one to the right of this no idea as someone has decided not to identify its purpose. The off peak meter to the right of the meter is likely to be redundant and could be removed.
 
Can't see too much wrong with that , especially the part that WP would be interested in. Earth wires are a bit untidy, there's some unused stuff that could do with removing, and the service connector blocks could do with straightening up.
 
It isn't ancient. The corroded switch fuse may be redundant as it has three fuses sitting on top and evidence of a disconnected cable although it is still switched on. The newer one to the right of this no idea as someone has decided not to identify its purpose. The off peak meter to the right of the meter is likely to be redundant and could be removed.
Seen one eaten through with rust.
 

Reply to Thoughts of experts welcome - ancient three phase install? in the Commercial Electrical Advice area at ElectriciansForums.net

Similar Threads

(Thought I'd already poost this Q, but I cant see it, so I'll try again) We have some work going on in one of our buildings atm. On of the chaps...
Replies
7
Views
1K
So far I have never had to deal with a new supply but a possible site we are looking at will need some major changes and so I wondered if folks...
Replies
2
Views
692
Hello all, I've just been perusing the AM2/E/S threads on here. Thought you might like a bit of a review. If, like I did, you find yourself...
Replies
7
Views
2K
Morning All I recently completed my first re wire and board change, (with help from the owner who is a gas fitter and plumper, who works with my...
Replies
0
Views
1K
Hi everyone, I have a quick question if I may? I'm thinking of adding a second PV system to my existing rooftop PV & battery setup. As the...
Replies
0
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock