Still compliant with a previous edition? I've no idea when the yellow/green sheath was brought in!

Yeah I was being sarcastic.
In all seriousness though at my place of work they have some strange old ways of doing things though.
They labelled the three phases A B and C. So when you see a circuit labelled for example 2B it is not 2 blue but 2 yellow!
And in some old buildings the third phase is coloured not blue but green!
This is all old crap from just after WW2!
 
Yeah I was being sarcastic.
In all seriousness though at my place of work they have some strange old ways of doing things though.
They labelled the three phases A B and C. So when you see a circuit labelled for example 2B it is not 2 blue but 2 yellow!
And in some old buildings the third phase is coloured not blue but green!
This is all old crap from just after WW2!

where the hell do you work ??? a victorian steam factory ?? lol
 
bloody obvious, innit? what's missing are the slots for the white fuse to push into.
 

OFFICIAL SPONSORS

Back
Top