rule for first day. if they run out of 25mm nipples and ask you to thread a length of conduit tell them to go and get a long wait ;)
 
I'm with the grinder way of thinking, I wouldn't use a hacksaw anymore but each to there own. And one thing I would add is I know everyone loves there cordless gear but I'd take a decent 110 grinder with you as it does kill the batteries pretty quickly. Good luck with your bubble sets they can be a bit tricky to get to grips with. I think you should put a pic up of your first go no cheating and tweaking it. Your genuine first effort. Good luck
 
Il cut and thread , few 90s .. No sweat , bubble set and offsets il fail.. But this probably the job I'm waiting for ...
 
As far as the conduit work goes, look out for the best guy on site for measuring and setting, and learn all you can from him. I suppose that can also be said of trunking fabrication too. If you're keen to learn, i would think most of the good electricians on site will be willing to show you how it's done. So long as you don't make a nuisance of yourself
 
As far as the conduit work goes, look out for the best guy on site for measuring and setting, and learn all you can from him. I suppose that can also be said of trunking fabrication too. If you're keen to learn, i would think most of the good electricians on site will be willing to show you how it's done. So long as you don't make a nuisance of yourself

And failing that, sneek in after hours and get more practise in when no one's looking!
Sling the scrap.
 
Trunking and conduit was all part of your apprenticeship all good electricians should be able to carry out these basic tasks

Not so it seems these day's!! T&E and SWA is about the limit of what students are being taught in any depth at colleges.
 
me too, then gentle pressure on forward stroke, release on drawback, us most of the length.

Its early morning and have only had one coffee. Have we changed the subject now... :)
 
Not so it seems these day's!! T&E and SWA is about the limit of what students are being taught in any depth at colleges.

You are right there When new AM2 was introduced they changed a few things, see below.

The new AM2 exam differs from the old one:
• MIMS (pyro) or Mineral Insulated Metal Sheathed cable use and termination removed
• Installation of steel conduit is now removed;
• All the electrical containment is already installed so you only need to do the wiring from one
equipment to another;
• All the wiring needs to be installed using the preinstalled cable tray, steel and PVC
compartmental trunking and PVC conduit;
• In comes the S Plan central heating and hot water system with a solar thermal sustainable
energy element;
• In comes the requirement to install and test data-cabling systems (Cat5);
• Time for the composite installation has been reduced from 10 hours to 8 h 30 min.
 
Nah timbo just looked at job centre, the works in cookstown, think he's looking men too ...


i also know guys in Sunderland getting 80hrs a week.

and as to am2 it isn't hard. At college we learnt trunking, pipe and pyro. But briefly and as I have done that much of it have expanded my experience with it..
 