If he cannot visually see it in the kitchen I would check the CU for any evidence of one.
Although this test would prove if the water service was not extraneous and therefore not need bonding.The earthing system has not been stated. If it's TNCS then testing to a local socket or other earth is not sufficient to verify compliance. If the service requires bonding then it will have to be in 10mm minimum which can only be verified by a combination of testing and visual inspection.
it must be excisable for any testing at a late date and verified.The pipe coming in a don’t no, without moving the kick board which has been sealed in.
Eh?it must be excisable for any testing at a late date and verified.
Although this test would prove if the water service was not extraneous and therefore not need bonding.
A bit controversial, but all these questions about bonding, earthing seems t be coming from the Domestic side of our industry.
Does this not say something about the training given to newcomers to electrical installations, or am I over thinking the problem?