So today I was working on an event for armed forces day. Local council organised job so site power was done by their NICEIC approved contractor. And it was downright dangerous!
The main stage had one feed from a generator and one from a nearby building with a TNCS supply. I couldn't see an earth rod anywhere near the generator and there was no effort to link the two earth systems. And they didn't bother to bond any of the metal structure. They obviously had never heard of bs7909, let alone complied with it!
But I guess it's ok cos they were NICEIC registered and it was only one member of the royal family we had on the stage for them to kill.
The same company is responsible for the emergency lighting in a local theatre, they've fed each unit via an FCU bolted to the side of the nearest socket.
The main stage had one feed from a generator and one from a nearby building with a TNCS supply. I couldn't see an earth rod anywhere near the generator and there was no effort to link the two earth systems. And they didn't bother to bond any of the metal structure. They obviously had never heard of bs7909, let alone complied with it!
But I guess it's ok cos they were NICEIC registered and it was only one member of the royal family we had on the stage for them to kill.
The same company is responsible for the emergency lighting in a local theatre, they've fed each unit via an FCU bolted to the side of the nearest socket.