re : the threads title.... you can't work with too many plumbers....... as long as you're a hangman.
 
Is ther much in them electrically?
just asking as ive 2 of these to do in November.one in a big house and the other in an industrial unit.
no details regarding hoppers and the like as yet

not a massive amount of wiring to do on the boilers we have wired (guntamatic)

in the boiler house/plant room there will be supplies to
boiler
pump
valves
heat meters
pressurisation unit

probes to connect up for metering
fault monitor if specced

pipes are run underground to existing buildings with existing
heating systems . disconnect the boilers in these buildings so the existing systems
fire the existing pump and bobs your uncle .


the industrial unit will likely have fan heaters , destrat fans and a pump

if you get stuck ask the plumbers lol
 
Are you saying that you have taken work on, that you don't know how it works??
err this is what i got the other day
im putting 2 biomass units in next month
one in the house and one in the factory ill get you some instructions.
im sure ill manage. he has 2 plumber lads who are good to do the wet side
it will be just controls for me.
 
been doing a lot of subbing to a heating firm recently , teams of 4 plumbers and one spark installing

biomass boilers .

The latest load of nonsense from them ...

Spark : Why is there 3 x 2 port valves on that s plan ?

Plumber : The 3rd valve is a safety feature for the unvented cylinder .

Spark : Ok how does that work ?

Plumber : It has to be connected thru the thermal cutout on the cylinder.

Spark : Ok . Seems pointless considering i have already connected the hot water valve thru the thermal cutout .

Plumber : If the valve fails and keeps filling the cylinder it could explode

spark : If the valve fails it will close

plumbers : All scratching there heads at this point and now arguing amongst themselves quoting regs and theories and

what ifs ,

a quick sgeg on that evil place the pluming forum (which looks alot like this place) reveals

the sparky is correct in this instance .


After weeks of working with these savages , the spark is coming out on top

i wonder what next week will bring and i look forward to telling the f**kers tomoro haha



"Hello jackhammer JIM",

Another example of the very poor opinion that some Members / Electricians have of Plumbers - I have always liked a bit of banter between Trades - BUT - `these savages` - ! !

I am glad that I have never had to work with an Electrician / Tradesman who had this type of opinion about `Plumbers`.


No doubt I will now get some abuse for those comments.



Obviously the Plumbers were trying to ENSURE that the Unvented Hot Water Cylinder was wired so that the Cylinder `Safety Zone Valve` operation would definitely work IF / when the Overheat thermostat / Thermal cut out operated - whoever is the `Competent Person` registered for Unvented Hot Water Storage Installations is responsible for ensuring that ALL of the Safety Equipment is working correctly - under the Building Regulations Part G3.

I did previously write / post a very detailed message to You - detailing the requirements of the Building Regulations Part G3 - Manufacturers Installation Instructions etc. - But I deleted it as I felt that You would probably not appreciate the information - it may have been taken as Me trying to be `Pedantic` - which is the last thing that I want.


I am guessing that the Plumbers did NOT realise that You had wired the Cylinder Zone Valve so that the Overheat thermostat / Thermal cut out would cause it to close on its spring return - obviously then providing Safety from the contents of the Unvented Hot Water Cylinder from overheating - they were obviously thinking that there should be a second 2 port zone valve installed to be controlled by the Overheat thermostat / Thermal cut out.


It would be something that they should query with You if they were unsure as although ONLY `Competent Persons` who have been Trained and Assessed in Unvented Hot Water Storage are legally allowed to install this type of Cylinder - obviously the Electrical connections can only be carried out by an Electrician / Competent Person on Electrical works - but they thought You should be wiring a second 2 port valve - perhaps they had installed it ?

They may have been more used to Y Plan / 3 Port Zone valve Heating systems where an additional 2 Port Zone valve MUST be fitted to the Unvented Hot Water Cylinder Coil Primary Flow pipework and wired to the Unvented Cylinder Overheat thermostat / Thermal cut out.


Regards,


Chris
 
Last edited:
one thing i can never understans with BG and other gas fitters, is why they insist on taking the gas bonding to the outside meter, rather than inside to within 600mm of the point of entry.
 
one thing i can never understans with BG and other gas fitters, is why they insist on taking the gas bonding to the outside meter, rather than inside to within 600mm of the point of entry.


"Hello telectrix",

I have found that most GOOD Heating Engineers / Gas Engineers / Fitters think that unless it would be virtually impossible to connect the Earth cable within the Gas Meter Box that it should be connected to the incoming Gas pipe in the Box.

Personally I would rather see it like that instead of connected under the Floor inside the property - which in a lot of Houses would probably be under the Living Room Floor [Meter box at thye front of the House] - or perhaps under the Kitchen Floor and under Kitchen Units which are often fitted after the Gas pipework has been installed.

When I have worked with Electricians who have known Me for a long period of time they would trust Me to run the Earth cable out into the Gas Meter box near to My Gas pipe - using a seperate hole in the wall and sealing the hole after they had carried out their connection within the Meter box - and I was always happy to do it in order to have the Earth connection to my new Gas supply pipework visible.

I know that an Electrician can obviously test to confirm that the Earth cable is connected to the Gas pipe - but usually Builders and Gas Engineers like to be able to actually see the Earth Clamp / connection.


And there is a Gas Safety Inspection reason why this should be a requirement:


When a Gas Safety Inspection or Landlords Safety Inspection is carried out one of the visual Inspections is to check that there is an Earth connection to the Gas Pipework - `within 600mm of the Gas Meter` - if that cannot be seen then a `Warning` / Advisory will be given to the client who would then have to send in an Electrician to establish whether there is an Earth cable connected to the Gas supply.

Unless it could be acertained from Documentation from a previous Electrical Inspection that there was an Earth connection to the Gas supply under the Floor - `at the entry point of the Gas supply into the Building` - this would be an additional expense - AND how could anyone be certain that nothing had changed since the previous Electrical Inspection which might have caused the underfloor Earth connection to have been disconnected without an Electrician visiting to test the Earth connections ?


Although I realise that the Earth cable could be damaged / disconnected in a variety of possible scenarios - but still be connected at the Gas Meter box - I feel that as the Earth cable connection to the Gas supply is a visual inspection requirement of a Gas Safety Inspection / Landlords Gas Safety Inspection under the Gas Safety Regulations - the Gas supply Earth connection to the Gas pipe should where possible be connected in the Gas Meter box.

That would obviously require some liaison between the HSE / Gas Safe and the IE to make it an Electrical Regulation to connect the Earth cable within the Gas Meter box - unless `physically impossible` - perhaps for example where the Gas Meter box is remote from the Building with the Gas supply run to the Building in a trench which was not open for running an Earth cable in some sort of conduit when the Gas pipe was installed.

In most other circumstances that I have been involved in it has usually been possible to run the Earth cable into the Gas Meter box - as if I can run a 22mm or 28mm copper pipe there it was possible to run an Earth cable also.


Just MY thoughts on the matter - from the Gas Safety Inspection / Gas Safety Regulations point of view.


Regards,


Chris
 
Last edited:
relax chris

written more of a joke than serious slagging of the wet ones


"Hello jackhammer JIM",

Thanks for your reply.

I was just mentioning that because Unvented Hot Water Cylinders are specifically covered by the Building Regulations Part G3 - and ONLY Competent Persons who have been Trained and Assessed [every 5 Years] and are therefore registered to install Unvented Hot Water Storage systems are legally allowed to install them - some of those `Competent Persons` don`t install Unvented Cylinders very often and when they do they want everything to be the same / similar to the last installation that they did or saw.

The Plumbers were right to at least discuss the Electrical aspect of the Unvented Cylinder`s Safety Zone Valve with You - they might have carried out an installation previously or seen one where an additional 2 port zone valve had been fitted to the Unvented Cylinder on an S Plan Heating system.


This used to be done when Unvented Hot Water Cylinders were first allowed to be installed in the U.K. and for a few Years after until the interpretation of the Building Regulations G3 relating to the Temperature Safety Device / Thermal cut out process was clarified - and Unvented Hot Water Storage systems Training and Assessment providers also clarified that only ONE 2 port Zone valve was required on an Unvented Hot Water Cylinder on `S Plan` type Heating systems.

As I am sure You know the 2 port `Safety Zone Valve` is usually supplied by the Manufacturer with an Unvented Hot Water Cylinder - these are obviously used in addition to a 3 port Zone valve when an Unvented Cylinder is installed on a Heating system which is on a Y Plan pipework and wiring configuration - the Plumbers that You have been working with have probably seen this and thought that there should also be an additional 2 port zone valve on an S Plan Heating system [?].


I would have thought that there would have been someone in their Heating Company who knew the Zone valve configuration / wiring to the Unvented Cylinder`s Overheat Thermostat / Thermal cut out.


Anyway - You have now `educated them` so the `Inter-Trade Technical liaison process` was in operation on your Job - well done !


Regards,


Chris
 
"Hello telectrix",

I have found that most GOOD Heating Engineers / Gas Engineers / Fitters think that unless it would be virtually impossible to connect the Earth cable within the Gas Meter Box that it should be connected to the incoming Gas pipe in the Box.

Personally I would rather see it like that instead of connected under the Floor inside the property - which in a lot of Houses would probably be under the Living Room Floor [Meter box at thye front of the House] - or perhaps under the Kitchen Floor and under Kitchen Units which are often fitted after the Gas pipework has been installed.

When I have worked with Electricians who have known Me for a long period of time they would trust Me to run the Earth cable out into the Gas Meter box near to My Gas pipe - using a seperate hole in the wall and sealing the hole after they had carried out their connection within the Meter box - and I was always happy to do it in order to have the Earth connection to my new Gas supply pipework visible.

I know that an Electrician can obviously test to confirm that the Earth cable is connected to the Gas pipe - but usually Builders and Gas Engineers like to be able to actually see the Earth Clamp / connection.


And there is a Gas Safety Inspection reason why this should be a requirement:


When a Gas Safety Inspection or Landlords Safety Inspection is carried out one of the visual Inspections is to check that there is an Earth connection to the Gas Pipework - `within 600mm of the Gas Meter` - if that cannot be seen then a `Warning` / Advisory will be given to the client who would then have to send in an Electrician to establish whether there is an Earth cable connected to the Gas supply.

Unless it could be acertained from Documentation from a previous Electrical Inspection that there was an Earth connection to the Gas supply under the Floor - `at the entry point of the Gas supply into the Building` - this would be an additional expense - AND how could anyone be certain that nothing had changed since the previous Electrical Inspection which might have caused the underfloor Earth connection to have been disconnected without an Electrician visiting to test the Earth connections ?


Although I realise that the Earth cable could be damaged / disconnected in a variety of possible scenarios - but still be connected at the Gas Meter box - I feel that as the Earth cable connection to the Gas supply is a visual inspection requirement of a Gas Safety Inspection / Landlords Gas Safety Inspection under the Gas Safety Regulations - the Gas supply Earth connection to the Gas pipe should where possible be connected in the Gas Meter box.

That would obviously require some liaison between the HSE / Gas Safe and the IE to make it an Electrical Regulation to connect the Earth cable within the Gas Meter box - unless `physically impossible` - perhaps for example where the Gas Meter box is remote from the Building with the Gas supply run to the Building in a trench which was not open for running an Earth cable in some sort of conduit when the Gas pipe was installed.

In most other circumstances that I have been involved in it has usually been possible to run the Earth cable into the Gas Meter box - as if I can run a 22mm or 28mm copper pipe there it was possible to run an Earth cable also.


Just MY thoughts on the matter - from the Gas Safety Inspection / Gas Safety Regulations point of view.


Regards,


Chris

Hi I notice that when you refer to yourself you like to use a capital letter, are you God?
 
Hi I notice that when you refer to yourself you like to use a capital letter, are you God?

Chris just likes to throw in a few extra capital letters, not just when referring to himself; a bit odd, but that's his style. Better than leaving them all out, like some on here.

Irrespective of the posting style, his content is generally sound.
 