topquark
No rule about it, but that would make sense.... and out of place with other fixtures, I guess.
No rule about it, but that would make sense.... and out of place with other fixtures, I guess.
Yep, just had that. Coz it's classed as "new build". Had an additional switch downstairs (for 3 floor switching for the lights). That could be at the old heights. The whole of the new floor had to comply with part M (ie new heights for switches / sockets).Ever had problems from building control wanting sockets in loft conversions at the 450 even though there is no wheelchair accessibility for the 2 flights of stairs in the house? I have and it drives me crazy!!
I'm a building contractor refurbishing a house in north London. The client is employing an electrician direct to rewire the place and insists on sockets at 250mm off the floor. Since about 2005 my sparky has always installed them at 450 off finished floor to underside of socket for rewires. I'm ultimately responsible for getting building control to sign off I don't have an on site guide and my sparks has disappeared abroad for a month. Can anyone quote the relevant building regs parts (think this is part m rather than part p from memory). I'm sure I'm basically right but I need evidence to show the client to avoid future headaches. Thanks.