How can we possibly question something that is nonexistent?
In you’re defence, some of the answers haven’t been much better.

You are a charlatan if you take payment for a professional service you can not provide.
and what was wrong with the charlatans?.....
madchester....
 
Its fine, the worlds ending in 9 days so no need to worry! ha

:yawn:

Thought that was meant to be today 12:12:12 12/12/12...

Looks like they where wrong again...unless it wasnt at GMT, aaaahhhhh there's still time...
 
Thought that was meant to be today 12:12:12 12/12/12...

Looks like they where wrong again...unless it wasnt at GMT, aaaahhhhh there's still time...

As you say it's gone 12:12:12 12/12/12 and I still haven't been struck down!

I must still be needed to spread misery and gloom for Christmas.
 
I watched british gas fit a boiler once.. Im going to ask the plumbers forum how i can fit my own next time..

How will it go down ??
 
I know how op feels having done what he has done. These course sound good turns out there crap and leave you wanting. I have been lucky in that I employ a proper spark who is teaching me. If I were you I'd get in with a spark (not to local) pay him on this job and see how it's done in a real environment with all the hassle that can follow. These courses teach nothing about this, only want your dollar, and you'll probably find the guy teaching you on course was a Electrical Trainee as well.
 
Last edited by a moderator:
Thought that was meant to be today 12:12:12 12/12/12...

Looks like they where wrong again...unless it wasnt at GMT, aaaahhhhh there's still time...

Was it? rumour round these ends is that its going to end on the 21st, well thats what im hoping otherwise the family aint getting any christmas presents haha
 
i thought the lancashire/yorkshire border was the world's end .
 
It would be quite normal to install a 6 amp mcb in place of a 5 amp 3036, a 16 amp mcb in place of a 15 amp 3036, and a 32 amp mcb in place of a 30 amp 3036. One of the 30 amp 3036 will be an oven, one of the 15 amp, as said before, will be the immersion. Make sure that any cable present is capable of taking fault current and that the Zs reading complies. Take your time and do end to end on the ring finals and R1+R2 on all the radials. Obviously carry out insulation resistance test either global or individual circuits to prevent unwanted RCD tripping and notify the work accordingly. Good Luck.


mmm criticise others for not being helpful but how can you give accurate advice when you are guessing at the loads if you have not seen the instillation how can you say one of the 30A will be an oven ? and he stated " and 2.5 mm csa for the 30 amp two of witch are radial and one is a ring " radials on 2.5 should be on nothing more than a 20A but he have no idea what is what so we cant really give any advice and to give wrong advise is worse than no advise from the knowledge the op shows from what he describes then the best advice has been given get a proper spark in and watch and learn and think hard about his comment about having 3 kids to feed you cant feed them if in prison for killing someone else with poor wiring because he does not care !
 
i thought the lancashire/yorkshire border was the world's end .

Haha, it does feel like that.......you drive across to lanc land and you don't half get a sense of "my life isnt that bad after all really" haha nah im just kidding, lanc isn't that bad.....it just isn't that good :grin:
 

OFFICIAL SPONSORS

Back
Top