cant you remove the cupboard its fitted in to allow more room for the new one ?

otherwise you may be in for a hefty bill as you will need RCBO's to fit a small enough board in that cupboard :)

Possibly, I could put a larger cupboard in place afterwards, although I would have proffered not to, as it is plastered and recently decorated... But I may have no choice unfortunately.
 
fitting a larger cupboard will hide the gap round the old one. so no need to re-decorate :)
 
Looking at the CU, do you think it would be fairly straight forward for an electrician to put a separate shower RCD/MCB CU in, if I make more room above the CU? I assume bonding would have to be confirmed, but could any thing else cause problems for the electrician?
 
For the electrician or for you?

I might have had a crack at putting an RCD in, but I'm certainly not competent enough to mess with the consumer unit and don't pretend to be. I am following advice received on here by supposedly competent people, which is why I am not going ahead with fitting the original RCD...and to the ones that have given helpful advice...thanks very much
 
Theres no way anyone will fit anything in that cupboard, it needs to come off and then a new cupboard built around the new board or old board and new RCD unit added.
 
better off getting a new DB in my opinion.
dont forget, even if you put an RCD shower unit in, it will take up more space then a new DB and you will then need space for a henley block :)
 
Ok thanks, will look at that option and hopefully there won be any other obstacles behind the studded wall! I want to keep the cost down as much as possible, as I wasn't anticipating having this done and just hope that the CU doesn't cause whoever does it, any headaches.

thanks
 
it will be fine. most sparks will be able to change that DB within an hour and get it all tested pretty quick depending if there much previous DIY electrical work been done since the house was wired ?

just think, you will have much safer electrics with a new DB
 
it will be fine. most sparks will be able to change that DB within an hour and get it all tested pretty quick depending if there much previous DIY electrical work been done since the house was wired ?

just think, you will have much safer electrics with a new DB

Apart from the shower, extractor fan and a few extra sockets nothing has been done since we've been here. However, I've no idea what other people may have done before, and no clue as to why the extra wires are coming from the CU.

i totally agree, it will be much safer and the added bonus that the rest of the house will be protected and not just the shower...but just a bit more of an expense!

thanks
 
Ok, I have pretty much decided on having a new CU fitted...but as a less disruptive alternative, does anyone know if a 40a 30ma RCBO can be bought for this type of CU?

i realise that this will have to be done by an electrician and that it won't protect the whole house, but may be less disruptive for us.

cheers everyone
 

Attachments

  • image.jpg
    image.jpg
    138.4 KB · Views: 76
DO you mean the CU pictured? ...because you also said you're getting a new CU fitted.

For that board NO. for a new board Yes.
 