Hi,,
im doing a new build and the consumer unit is about 15-20mt from the meter cupboard. I’m going to use 25mm SWA 3 core, I have1 question I have to go up a long a short piece of stud work, do I need to put a box and blank on to identify the cable is there? Thanks