- Reaction score
- 645
Installing Swa 35MM 4 c,to new school block.
This supply will come of a MPB,nearby,to me the supply to this MPB does not comply.
Concern once again are the size of the bonding conductors realative to the the Main REC supply.
The drawing we have,have no input on this, it’s a Tncs system,& earth bonding will be required.
In a nut shell, even @ this moment the supply does not comply,in my opinion.
Any thoughts,on this,once again Swa being used as cpc & bonding conductor.
This supply will come of a MPB,nearby,to me the supply to this MPB does not comply.
Concern once again are the size of the bonding conductors realative to the the Main REC supply.
The drawing we have,have no input on this, it’s a Tncs system,& earth bonding will be required.
In a nut shell, even @ this moment the supply does not comply,in my opinion.
Any thoughts,on this,once again Swa being used as cpc & bonding conductor.