RCDs: protection of cables concealed in walls or partitions - https://electrical.----------/wiring-matters/issues/54/rcds-protection-of-cables-concealed-in-walls-or-partitions/
 
He is not a qualified electrician and instead gets his work certified at the end.
What happens if he gets things badly wrong and injures/kills himself or someone else, or a fire results in the meantime? Whose insurance policy covers the liability? Is your home insurance still valid if you employ a non-electrician to carry out a CU replacement/move, which is notifiable to building control? What/when is "the end" in this context?
 
Thanks for all your help. I will have to or everything on hold until I can get an electrician to do the move. All the new wiring has already been moved to the new CU spot. If it hadn't I would have sicks to the original location of the CU. More hassle than its worth!
 
Thankyou for that baldelectrician. It looks a lot smaller. Where can these be purchased from? That site doesn't have prices? Thanks
 
If the cables to the new CU position are to be concealed in any walls, then it’s very likely they will need RCD protection.
If however they are just going to run up the surface of the wall into the ceiling and along to drop down into the new CU, RCD protection will not be needed.
 
Thanks for that. The builder and I have managed to get the cable in today. It's a 25mm swa cable and it goes behind a stud wall and then up into the ceiling and then back down into the room where the CU is situated. In this case will the miniature circuit breaker not suffice? Thanks
 
Thanks for that. The builder and I have managed to get the cable in today. It's a 25mm swa cable and it goes behind a stud wall and then up into the ceiling and then back down into the room where the CU is situated. In this case will the miniature circuit breaker not suffice? Thanks
How is your electrician going to inspect this cable? From what you have described, much of it is concealed. It would have been a better idea to assist your electrician in pulling it through, rather than the builder.
 
I've taken photos and it was cheaper to get the builder to sort this side. The electrician will come later to hook up one side to the meter and the other to the CU.
 
Sounds like mcb will be ok, saves on the enclosure but the electrician will make that decision when he connects it all up :thumbsup:
 