I always thought there was an obligation for landlords to get PIRs done whether it be the law, insurer's requirements etc, hence being the only reason they bother at all - after all, £25 for a worthless bit of paper is £25 too expensive whichever way you look at it.
Sadly, it isn't law. The push is through what is effectively no more than Health and Safety - and in essence, the only requirement is to "prove" that you did the minimum necessary to provide a safe system.
It should be law, however, and IMO, we don't really have any better LEGAL responsibility than Victorian landlords did for their slums.
The other problem, of course, is that any "clever" landlord will spend years and masses of tenant money fighting any claim that he was negligent in any way - way too many loop holes still.
In new builds, the builder is obliged to produce an EIC for the electrical work as part of the handover package - but that still isn't law. It's pressure from insurers, bankers, and NHBC type schemes to ensure there is no come back on them in any way that will affect their income.
The fundamental problem is, and remains, that money remains the issue, and nobody up the chain actually gives a **** about safety, only so long as it doesn't stop their income.
IMO, it would be a simple matter to resolve almost all of the problems in one fairly clear law - which might be entitled "The Electrical Installations" Act.
It would prescribe minimums for each stage of any installation, and the maintenance thereof, from the point of connection to the DNO supply onward, until point of termination at any fixed appliance, accessory, or other device which can reasonably be considered a termination. It would in ALL respects be the law applied to all such matters.
For example - it would MANDATE the provision of a SAFE isolation point AFTER the metred DNO supply, and BEFORE the primary consumer unit, or distribution board, and would in ALL cases safely isolate the ENTIRE supply into the building. E.g. that would be a three phase isolator if more than one phase was supplied. I can think of
NO CASE AT ALL where isolating one out of three phases in a building can be considered safe isolation of the supply into the building, by the way.
From this point on, of necessity, it would call much of BS7671 into law also.
Critically, it would mandate a minimum qualification and licencing for working on any system, a method of recording irrevocably any work or tampering of the system (which isn't that hard to implement), and a minimum testing and inspection schedule - which IMO should be three yearly in a typical domestic, annually in commercial, and after any change in the installation, as minimums.
Why three years? Quite simply, with the pace of technology today, consumption of domestic households is NOT reducing - it is still INCREASING marginally, year on year. In three years from 2007 to 2010, the increase in electrical gadgetry in homes increased to such a point that a 60A main supply is not enough in over 70% of homes now. And 80A supplies are also reaching their limits fast.
Most DNO's are facing the fact now that even 100A supplies will not be sufficient before too many more years pass, and are wondering with quavering rear pipes whether or not they are looking at substantial grid rewiring - upto and including the final concentric into buildings.
We all know that a 100A HNVC fuse will supply well over 100A before it blows. And we all know too that if domestic circuits start getting overloaded, people are all too willing to simply run extension leads from other circuits, rather than have the fault fixed. - This is another tale altogether, and one in which we get into discussions of whether ring finals or radials are better.....
Either way, I think the time has come that we have a large number of fairly critical issues affecting the industry, some of which ,granted, have been with us for years, but it is time for our esteemed "industry bodies" to get off their rears, and start making noise on our behalf at all levels.
Or am I missing the plot somewhere?