Hi,

Can anyone suggest why these meters appear to be wired in series please?

Thanks
 

Attachments

  • IMG-20120316-00367.jpg
    IMG-20120316-00367.jpg
    165.2 KB · Views: 74
They look to be in parallel with left hand one unused. Have a closer look at the incoming of the LH meter.
 
Background info if any...... could be a faulty meter dispute where they fit a second one to confirm its working ok, cant see any other reason but a pulled back image may give clues
 
Hi, sorry I meant parallel, but what I wasn't sure of was the connection terminals for this meter - ACTARIS. I cannot find anything on the internet for this!
 
I've changed my mind, I think they are in series, however, it doesn't really matter for the problem I'm trying to solve. Either the meter on the left is redundant (parallel) or it is being checked for calibration by a second (series). A terminal diagram of an Actaris would be good if anyone can point me in the right direction? Thanks
 
We all be in same boat for diagram as its DNO territory but shouldnt really require one (L1 in L1 out) --- (L2 in L2 out) etc etc and N, if (LI in) is doubled up on L/H meter and (L1 out) is empty and respectively for L2 and L3 then meter is not in use as its parallel, if the second meter is fed of the load terminals of first then its series and most likely because its proving the reading because of dispute.

Nothing more we can really say on this as the terminals will be clearly marked if the cover was removed so no need to really supply a connection diagram.
 