Hi,
New to the group.
I am looking at expanding the number of panels on the roof with an additional inverter and currently have an application into the DNO but I have 2 questions as trying to workout the best layout within the garage. I don't want to engage an installer at this stage unless the DNO approve.
Q1 : How close can I mount the inverter to a gas pipe and can that be mitigated by enclosing said pipe ?
Q2 : Can you wire the existing generation meter to monitor both inverters ? my thought are yes but want confirmation.
If so, then can it be done by the following : meter tails to master switch in CU, then to the generation meter and then back into the CU into a 63A RCD which will feed 1x 32A and 1x 20A MCB (inverters), 1x 6A MCB (2x EM115 meters) 1x 6A MCB (tigo CCA)
Thanks for your time.
New to the group.
I am looking at expanding the number of panels on the roof with an additional inverter and currently have an application into the DNO but I have 2 questions as trying to workout the best layout within the garage. I don't want to engage an installer at this stage unless the DNO approve.
Q1 : How close can I mount the inverter to a gas pipe and can that be mitigated by enclosing said pipe ?
Q2 : Can you wire the existing generation meter to monitor both inverters ? my thought are yes but want confirmation.
If so, then can it be done by the following : meter tails to master switch in CU, then to the generation meter and then back into the CU into a 63A RCD which will feed 1x 32A and 1x 20A MCB (inverters), 1x 6A MCB (2x EM115 meters) 1x 6A MCB (tigo CCA)
Thanks for your time.