Hi All,
New poster here!!
after some advice surrounding testing of mobile units...
I have had to rewire 7 Ice Cream Units (static ones that are used at Theme Parks), as they were originally from Spain, and nothing in them conformed with our current regs (Gotta love them Europeans!)
Ive installed new DBs, 6 way Wylex single phase, on a 100a main breaker, which is connected for power via a 32a commando sockets.
I am having to use a generator to test, as there is no power in the yard. Are the tests I need to carry out the exact same as it would be ifI had done a rewire of a new office for example? I’m pretty sure (but may be wrong) that I remember seeing somewhere that there is something different surrounding the regs of testing these types of units...
Any advice is greatly appreciated
New poster here!!
after some advice surrounding testing of mobile units...
I have had to rewire 7 Ice Cream Units (static ones that are used at Theme Parks), as they were originally from Spain, and nothing in them conformed with our current regs (Gotta love them Europeans!)
Ive installed new DBs, 6 way Wylex single phase, on a 100a main breaker, which is connected for power via a 32a commando sockets.
I am having to use a generator to test, as there is no power in the yard. Are the tests I need to carry out the exact same as it would be ifI had done a rewire of a new office for example? I’m pretty sure (but may be wrong) that I remember seeing somewhere that there is something different surrounding the regs of testing these types of units...
Any advice is greatly appreciated