Hi guys

Carrying out a rewire on my property and I am hoping to use my old board as it is an RCBO board 8way. However in the future I may add circuits and may have to update the board to a larger one. In order to do this however the consumer unit would have to be moved to an adjacent wall as there is no space at the moment for a larger board. The new circuits I am running in I have left enough length on them if ever a board chance is carried out. My only concern is is it safe to have excess cable under the floorboards kind of coiled up looking a bit of a mess. Concerned about over heating etc. I will try not to coil them as I know this could be an issue
 
A sensible question, obviously as you have already worked out too much could cause heat issues, out of interest when is the new board going in?
 
I’m hoping to get away with the 8 way for now. At least a couple of years the longest.

Not another live circuit no just it’s designated circuit. For instance I have just ran in the downstairs ring main and have left an extra 2m on each tail for possibility of new board on adjacent wall so that I have sufficient cable in the future save taking up floorboards and flooring etc
 
I’m hoping to get away with the 8 way for now. At least a couple of years the longest.

Not another live circuit no just it’s designated circuit. For instance I have just ran in the downstairs ring main and have left an extra 2m on each tail for possibility of new board on adjacent wall so that I have sufficient cable in the future save taking up floorboards and flooring etc
Is that in answer to my question post 3?
 
Don’t coil/roll them up, just lay them loosely in between the joists in an up & down fashion.
 
Will be fine to leave below, as mentioned dont coil, just clip them a couple Of meters down some joist and then back to keep them off the floor which may be damp.

However, if you can juat put in the larger board now, you will wish you had of done in a couple of years. See if you can get the same make and reuse the RCBOs
 

Reply to Cables coiled for future CU change in the Electrical Wiring, Theories and Regulations area at ElectriciansForums.net

Similar Threads

I have a fuseboard change I need to do soon I’m putting in a FUSEBOX 7 or 10 way RCBO+ SPD My only concern is how I should run the pyro cables in...
Replies
16
Views
1K
I have had my kitchen rewired and plastered. I have had a 6mm t+e on a dedicated 32a circuit for a 60cm electric cooker. In hindsight, had i known...
Replies
11
Views
547
Hi, I have a job for a customer, the consumer unit is an old 3036 board and there are several holes in it giving access to live parts, I can...
Replies
6
Views
692
Morning guys, Just been to look at a CU change and there was a bit of an oddity with the PME connection in the old black cut out. Looking at the...
Replies
2
Views
602
So was on a call out today and cooker circuit kept tripping the RCD. Disconnected at the board and at the cooker switch and IR’d the cable and...
Replies
9
Views
377

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock