M
Mark
I have the following:
Extension Ring 32A
Up Ring 1 32A
Up Ring 2 32A
Down Ring 1 32A
Down Ring 2 32A
Kitchen 1 Ring 32A
Kitchen 2 Ring 32A
cooker 1 32A
Cooker 2 32A
Shower 16A
Up Lights 1 6A
Up Lights 2 6A
Up lights 3 6A
Down Lights 1 6A
Down Lights 2 6A
Down Lights 3 6A
Smoke Alarms 6A
Garage Supply 40A
Outbuildings 50A
The Electricity board say that they are unable to supply us with 3 phase power.
How can i run all that lot of a single phase main.
Split the tails and have 2 DB?
Can i have some Advice and guidance as to where i should go with this as the place is nearly ready to be made live but i need to know if its even legal to connect all this up to the existing 100A supply
All is going through LABC btw.
Extension Ring 32A
Up Ring 1 32A
Up Ring 2 32A
Down Ring 1 32A
Down Ring 2 32A
Kitchen 1 Ring 32A
Kitchen 2 Ring 32A
cooker 1 32A
Cooker 2 32A
Shower 16A
Up Lights 1 6A
Up Lights 2 6A
Up lights 3 6A
Down Lights 1 6A
Down Lights 2 6A
Down Lights 3 6A
Smoke Alarms 6A
Garage Supply 40A
Outbuildings 50A
The Electricity board say that they are unable to supply us with 3 phase power.
How can i run all that lot of a single phase main.
Split the tails and have 2 DB?
Can i have some Advice and guidance as to where i should go with this as the place is nearly ready to be made live but i need to know if its even legal to connect all this up to the existing 100A supply
All is going through LABC btw.