I visited a property today to cost up a job. I spotted that the Main earth (16mm) had been bared back on its way to the board and clamped to the gas pipe. (Doubling up as a bonding conductor). The cable was continuous and was not cut or joined. Any installations I have ever done have been separate bonding and earthing conductors back to the MET. Is this a best practice today or does it actually say in a specific regulation that it does need to be separate (I've looked {probably not very well} but can't find anything) or is doubling up an old practice I've been missing for saving the pennys for my Friday beer money??? (still learning :wink5: ).
I can see its doing the same job but want to make sure any advisories to current regulations I give the customer are correct.
Cheers
I visited a property today to cost up a job. I spotted that the Main earth (16mm) had been bared back on its way to the board and clamped to the gas pipe. (Doubling up as a bonding conductor). The cable was continuous and was not cut or joined. Any installations I have ever done have been separate bonding and earthing conductors back to the MET. Is this a best practice today or does it actually say in a specific regulation that it does need to be separate (I've looked {probably not very well} but can't find anything) or is doubling up an old practice I've been missing for saving the pennys for my Friday beer money??? (still learning :wink5: ).
I can see its doing the same job but want to make sure any advisories to current regulations I give the customer are correct.
Cheers