The price won't be a problem for him. It was a useful socket for her which is why I think she was upset, still no justification in expecting me to put something dangerous back into operation and then trying to threaten to sue me when I refused to put it back as it was
 
can't she charge her vibrator in a different socket?
 
Did you test the dildo and make sure its class 2? Because if its class 1 it could have a live-earth fault.

On a serious note I think it's time you had a T&C on the quotes you give your customer saying something like. (If a fault is found which can be potentially dangerous circuit will be left isolated).
 
What's the problem it's only a DB, a 7 day part p course is all you need, stop making a song and dance about it all :tongue3:
 
The problem is the way the customer is treating me with regards to it. I've got terms and conditions in the estimate.

I may buy her a battery operated dildo just to keep her quite :)
 
Sorry to hijack this but do you guys do a series of tests when you go have a look an quote for a job?

or do you do the relevant tests when you get the job an before you start to remove old board?
 
depends on the job. if it looks to be a decent, unaltered installation, i just do a Ze and a couple of Zs readings. if it's a mess, i'll go a bit deeper.
 
What exactly is the problem???


i meant what is the fault, is it really such a big deal you could not have done something with it to keep the peace

its all part of the fun when taking on a CU change and unless it was a great expense i would of just sorted it out there and then, got paid, on to next job, happy customer!!

thats why i was asking what the fault is!
 
my thoughts too. also on comment below - dropping a cable down cavity loosely will mean its not supported throughout its run and therefore will be a non conformance on install cert. hope you manage to work something out. id assume he will want a fixed price to sort it at this stage which will be a hard one if its a nightmare to sort

So what if you're on a rewire and use the old cables to pull the new ones in say a cavity or void and you can't get in to clip it, does that mean you would put it as a non conformity on the test cert.? I think not!!
 
Every time on a CU swap, test the installation first then is all is good swap the CU. If anything is bad, then you either get paid for what you've done and leave the old CU in place or sort faults and fit new CU.

This is how i do it and always sees me right.
 
I'm quite surprised TBH at the title of this thread....personally if I had a plumber quote for a boiler change and halfway through it he said 'it's dangerous,sorry no boiler' I'd be pretty hacked off as well.
 

OFFICIAL SPONSORS

Back
Top