Surely that is referring to the design process.
132.16 states: "No addition or alteration, temporary or permanent, shall be made to an existing installation, unless it has been ascertained that the rating and the condition of any existing equipment, including the distributor, will be adequate for the altered circumstances
 
Ah, right. The electrician refused to do the testing based on the C3. Said it failed outright.

Periodic inspection and testing every 12 months.

I admit it's a weird one. Just my own pondering whether the installer could have given permission to energize.
But that periodic testing is only as good as the day it's tested, and the eicr does not apply once the board has been changed. Much like the mot on your car. Except changing the board is like taking every single screw and bolt out of your car, putting them back in and not getting it checked. He couldn't give permission to energise whilst still following regulation.
 
Last edited:
But that periodic testing is only as good as the day it's tested, and the eicr does not apply once the board has been changed. Much like the mot on your car. Except changing the board is like taking every single screw and bolt out of your car, putting them back in and not getting it checked. He couldn't give permission to energise whilst still following regulation.

Unless he inspected and tested. Which he could have done. But didn't. (I still find no regulation supporting your view mind.)
 
What was this C3 and was this C3 from a previous EICR.

The C3 was a 70-90mm gap between the existing conduit and the board. Planned to be sorted with boxing in later and grommets. Risk assessment done expected very low risk from the position of the board. Could not physically cause or contribute to an accident short of sticking a fork in it.
 
Unless he inspected and tested. Which he could have done. But didn't. (I still find no regulation supporting your view mind.)
You find no regulation that says you can't energise a circuit without testing being completed? I wont attempt to justify what I said, as I know i am correct. Scary to think anyone would consider energising anything without confirming its Sage
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

Joined
Location
Yorkshire
If you're a qualified, trainee, or retired electrician - Which country is it that your work will be / is / was aimed at?
United Kingdom
What type of forum member are you?
Trainee Electrician

Thread Information

Title
Does a CU swap require a full initial verification on all circuits before it can be energised?
Prefix
N/A
Forum
Periodic Inspection Reporting & Certification
Start date
Last reply date
Replies
35

Advert

Thread statistics

Created
BrianM,
Last reply from
MJPD29,
Replies
35
Views
4,031

Advert

Back
Top