Hi - Dave, this maybe from wording of 544.1.2 (?)There is nothing to say that gas must be before the first joint, where did you get that from?
I think that you are getting confused with before any branch (or T) pipework. Consideration needs to be taken into account of undoing of threaded joints (compression) ie the gas meter etc.Always told that before first joint because the threaded connection to meter ensures better continuity compared to a soldered joint
Always told that before first joint because the threaded connection to meter ensures better continuity compared to a soldered joint