Electricians Forums gets Artificial Intelligence to Answer Electrical Questions


Electricians Forums gets Artificial Intelligence to Answer Electrical Questions

(Edit: that isnt quite ready yet and we dont want to be testing on this established forum so the feature has been removed but we will watch it see how it fairs in a year or so)


Electricians Forums is currently being scanned fully a few times, all forums all threads, to teach an 'artificial intelligent agent' about electrics and electricals.

The aim is to have an option to have it contribute to your thread and then allow actual humans to correct it no doubt.

We will run it for a while in BETA. We might need to correct some older threads based on its output. But that can be an ongoing thing perhaps.

It will be locked behind subscription so it doesnt get abused by other bots just constantly asking it things and burning through our data.

10 goes per day for free was the best we could come up with to get it used by everybody. We may need to change this in the future.

Please test in this thread mainly.

In other threads keep the bot on-topic.
 
Last edited:
Let me see you sketch out method statements for something @EFBot

Gimme 3 options for a standard template.

AI-generated reply. more info

@Admin Here are three simple, reusable method‑statement templates you could adapt for most small jobs. I’ll keep them generic so you can drop the task name in.



1. Short “Domestic Job” Method Statement

1. Scope of Work
  • Task: [e.g. Replace single‑phase consumer unit in occupied dwelling]
  • Location:
  • Related documents (drawings, certs, RAMS, permits):

2. Responsibilities
  • Electrician in charge:
  • Helpers / apprentices:
  • Client contact / site keyholder:

3. Sequence of Works
  • Notify occupants, identify safe work area, set up barriers/signage.
  • Prove supply isolation (lock‑off and test dead as per safe isolation procedure).
  • Carry out task steps (bullet list – remove old kit, install new, terminate, label).
  • Test and inspect (IR, continuity, Zs, RCD tests, functional checks).
  • Re‑energise, final checks, housekeeping, handover and documentation.

4. Tools, Plant, Materials
  • Main tools:
  • Test equipment (with calibration status):
  • Key materials/components:

5. Safety & Controls
  • Hazards: live parts, trip hazards, dust, use of ladders, etc.
  • Controls: safe isolation, PPE, segregation of work area, good housekeeping, etc.

6. Emergency Procedures
  • First aid / fire arrangements:
  • How to raise alarm / location of nearest A&E:



2. “Small Commercial Project” Method Statement

1. Description of Works
  • Project:
  • Task:
  • Interfaces with other trades / live systems:

2. References
  • Applicable standards/regulations:
  • Drawings/specs:
  • Risk assessment ID:

3. Personnel & Competence
  • Supervisor:
  • Electricians:
  • Training / certs relevant to task (ECS, IPAF, asbestos awareness, etc.):

4. Access & Welfare
  • Site access arrangements and security.
  • Welfare, parking, deliveries.

5. Method / Step‑by‑Step
Pre‑works
  • Brief team, review RAMS, confirm permits and isolations.

Set‑up
  • Establish work zone, barriers, signage, lock‑off where required.

Execution
  • Numbered steps for the actual electrical work (cabling, containment, terminations, etc.).

Testing & Commissioning
  • Tests to be carried out, documentation, client demonstrations.

Demobilisation
  • Removal of waste, reinstatement, final sign‑off.

6. PPE & Equipment
  • Mandatory PPE:
  • Task‑specific PPE (e.g. arc‑rated where relevant):

7. Environmental Considerations
  • Waste segregation / WEEE, noise, dust, working hours.



3. “Maintenance / Call‑Out” Method Statement

1. Purpose
  • Type: Reactive / Planned preventative maintenance
  • System: [e.g. LV distribution board inspections]

2. Pre‑Visit Checks
  • Review previous reports/defects.
  • Confirm access, isolation possibilities, and any special site rules.

3. On‑Site Procedure
  • Sign in, induction/permit if needed.
  • Visual inspection of area and equipment.
  • Identify and agree outage window if isolation needed.
  • Safe isolation (document lock‑off point, prove dead).
  • Carry out maintenance/diagnostic steps (cleaning, tightening, testing).
  • Record findings, defects and recommendations.
  • Remove lock‑off, re‑energise, functional checks.
  • Update logbooks, issue certs/labels.

4. Records & Handover
  • What gets recorded (test results, photos, asset IDs).
  • Who signs off and who receives copies.

5. Safety Notes
  • Generic hazards (live work restrictions, working at height, confined spaces, etc.) and the instruction to refer to the job‑specific RA.



If you want, give me a specific job (e.g. “install 7kW EV charger on domestic driveway”) and I’ll plug it into one of these so you’ve got a ready‑to‑use example.
 
AI-generated reply. more info

@Admin Here are three simple, reusable method‑statement templates you could adapt for most small jobs. I’ll keep them generic so you can drop the task name in.



1. Short “Domestic Job” Method Statement

1. Scope of Work
  • Task: [e.g. Replace single‑phase consumer unit in occupied dwelling]
  • Location:
  • Related documents (drawings, certs, RAMS, permits):

2. Responsibilities
  • Electrician in charge:
  • Helpers / apprentices:
  • Client contact / site keyholder:

3. Sequence of Works
  • Notify occupants, identify safe work area, set up barriers/signage.
  • Prove supply isolation (lock‑off and test dead as per safe isolation procedure).
  • Carry out task steps (bullet list – remove old kit, install new, terminate, label).
  • Test and inspect (IR, continuity, Zs, RCD tests, functional checks).
  • Re‑energise, final checks, housekeeping, handover and documentation.

4. Tools, Plant, Materials
  • Main tools:
  • Test equipment (with calibration status):
  • Key materials/components:

5. Safety & Controls
  • Hazards: live parts, trip hazards, dust, use of ladders, etc.
  • Controls: safe isolation, PPE, segregation of work area, good housekeeping, etc.

6. Emergency Procedures
  • First aid / fire arrangements:
  • How to raise alarm / location of nearest A&E:



2. “Small Commercial Project” Method Statement

1. Description of Works
  • Project:
  • Task:
  • Interfaces with other trades / live systems:

2. References
  • Applicable standards/regulations:
  • Drawings/specs:
  • Risk assessment ID:

3. Personnel & Competence
  • Supervisor:
  • Electricians:
  • Training / certs relevant to task (ECS, IPAF, asbestos awareness, etc.):

4. Access & Welfare
  • Site access arrangements and security.
  • Welfare, parking, deliveries.

5. Method / Step‑by‑Step
Pre‑works
  • Brief team, review RAMS, confirm permits and isolations.

Set‑up
  • Establish work zone, barriers, signage, lock‑off where required.

Execution
  • Numbered steps for the actual electrical work (cabling, containment, terminations, etc.).

Testing & Commissioning
  • Tests to be carried out, documentation, client demonstrations.

Demobilisation
  • Removal of waste, reinstatement, final sign‑off.

6. PPE & Equipment
  • Mandatory PPE:
  • Task‑specific PPE (e.g. arc‑rated where relevant):

7. Environmental Considerations
  • Waste segregation / WEEE, noise, dust, working hours.



3. “Maintenance / Call‑Out” Method Statement

1. Purpose
  • Type: Reactive / Planned preventative maintenance
  • System: [e.g. LV distribution board inspections]

2. Pre‑Visit Checks
  • Review previous reports/defects.
  • Confirm access, isolation possibilities, and any special site rules.

3. On‑Site Procedure
  • Sign in, induction/permit if needed.
  • Visual inspection of area and equipment.
  • Identify and agree outage window if isolation needed.
  • Safe isolation (document lock‑off point, prove dead).
  • Carry out maintenance/diagnostic steps (cleaning, tightening, testing).
  • Record findings, defects and recommendations.
  • Remove lock‑off, re‑energise, functional checks.
  • Update logbooks, issue certs/labels.

4. Records & Handover
  • What gets recorded (test results, photos, asset IDs).
  • Who signs off and who receives copies.

5. Safety Notes
  • Generic hazards (live work restrictions, working at height, confined spaces, etc.) and the instruction to refer to the job‑specific RA.



If you want, give me a specific job (e.g. “install 7kW EV charger on domestic driveway”) and I’ll plug it into one of these so you’ve got a ready‑to‑use example.
install 7kW EV charger on domestic driveway plz (understand slang no?)

@EFBot
 
AI-generated reply. more info

@Admin Here are three simple, reusable method‑statement templates you could adapt for most small jobs. I’ll keep them generic so you can drop the task name in.



1. Short “Domestic Job” Method Statement

1. Scope of Work

Task:
Location:
Related documents (drawings, certs, RAMS, permits):


2. Responsibilities

Electrician in charge:
Helpers / apprentices:
Client contact / site keyholder:


3. Sequence of Works

Notify occupants, identify safe work area, s

AI-generated reply. more info

@Admin You’re asking for how to approach it, so here’s the practical outline – not a design sign‑off (you still need to do calcs and follow your local regs / DNO rules).

1. Up‑front checks
  • Check existing supply (phase, main fuse rating, tails size, earthing type, bonding).
  • Check spare capacity in CU / space for new ways or need for small EV sub‑board.
  • Confirm DNO notification or approval route for 7 kW EVSE in your area.

2. Typical arrangement (single‑phase ~32 A)
  • 7 kW charger = ~32 A at 230 V on its own final circuit.
  • Dedicated radial in suitably sized cable (e.g. 6 mm² T&E is common in the UK, but do the volt‑drop, thermal and installation‑method calcs).
  • RCD/RCBO per manufacturer’s requirements (Type A + 6 mA DC protection either in unit or upstream, depending on spec).
  • Adequate IP‑rated enclosure / switch‑disconnector if required by manufacturer or regs.

3. Cable route & protection
  • Plan route from CU to external point: clipped direct, in trunking, buried, or in duct.
  • If buried outdoors, comply with burial depth, mechanical protection and marker tape requirements.
  • Consider EVSE location re: impact risk, water ingress, cable trip hazards, and minimum heights/clearances.

4. Earthing & bonding
  • Check main bonding is up to scratch (gas, water, structural steel where applicable).
  • Confirm earthing arrangement; in PME/TT situations follow current guidance on EVSE earthing and open‑PEN protection – use the device type/earthing scheme specified by the EVSE manufacturer and your regs.

5. Testing & paperwork
  • Full testing of the new circuit (continuity, IR, Zs, RCD, functional test of EVSE including test box if you have one).
  • Issue appropriate electrical cert and EVSE commissioning sheet.
  • Notify building control / scheme provider / DNO as required.

If you want, say what country/earthing system you’re thinking of and rough run length / install method, and I can walk through a sample cable size and protective device combo in more detail.
 
AI-generated reply. more info

@Admin You’re asking for how to approach it, so here’s the practical outline – not a design sign‑off (you still need to do calcs and follow your local regs / DNO rules).

1. Up‑front checks
  • Check existing supply (phase, main fuse rating, tails size, earthing type, bonding).
  • Check spare capacity in CU / space for new ways or need for small EV sub‑board.
  • Confirm DNO notification or approval route for 7 kW EVSE in your area.

2. Typical arrangement (single‑phase ~32 A)
  • 7 kW charger = ~32 A at 230 V on its own final circuit.
  • Dedicated radial in suitably sized cable (e.g. 6 mm² T&E is common in the UK, but do the volt‑drop, thermal and installation‑method calcs).
  • RCD/RCBO per manufacturer’s requirements (Type A + 6 mA DC protection either in unit or upstream, depending on spec).
  • Adequate IP‑rated enclosure / switch‑disconnector if required by manufacturer or regs.

3. Cable route & protection
  • Plan route from CU to external point: clipped direct, in trunking, buried, or in duct.
  • If buried outdoors, comply with burial depth, mechanical protection and marker tape requirements.
  • Consider EVSE location re: impact risk, water ingress, cable trip hazards, and minimum heights/clearances.

4. Earthing & bonding
  • Check main bonding is up to scratch (gas, water, structural steel where applicable).
  • Confirm earthing arrangement; in PME/TT situations follow current guidance on EVSE earthing and open‑PEN protection – use the device type/earthing scheme specified by the EVSE manufacturer and your regs.

5. Testing & paperwork
  • Full testing of the new circuit (continuity, IR, Zs, RCD, functional test of EVSE including test box if you have one).
  • Issue appropriate electrical cert and EVSE commissioning sheet.
  • Notify building control / scheme provider / DNO as required.

If you want, say what country/earthing system you’re thinking of and rough run length / install method, and I can walk through a sample cable size and protective device combo in more detail.
Country: Wales, UK
Run length: 1000 lengths of sausage (sorry im not a sparky myself)
Method: Physically installing physical things to other already installed-by-human things. Can you take that job yet?

Thanks

(Does quote but no tag work? Test)

Edit: no that didnt work. Always tag it in!

@EFBot
 
Okay so that terminated the flow.

Conversation covered several posts from same member. Me.

What can it do while a couple of people are also talking?

And I wanna know, how does Google (or how do search engines but also "ai" search results) interpret this on our forum? Does the AI page and / or link need changing?

Should we segregate a forum to test in for 6 months or more before allowing it site-wide?

WhhhhooOOOooo knooooowwwwws? Ha

I'm inclined to just roll with it and deal with the individual issues case-by-case so that the system works with the whole NATURAL forum flow. Including spammers, sales people pretending to be end-users, false positive feedback and name and shaming to boot. (Not that we allow that in 95% of cases; strong evidence based threads bypass usual rules.)

Perhaps use the following forum for test threads you make yourself to keep it easier to manage should things go wrong?

Just a suggestion crack on otherwise.

 
Hey @EFBot continue from post 19.

(See if this works)

AI-generated reply. more info

@Admin Picking up where “Typical arrangement” was heading and finishing that off more cleanly.

2. Typical arrangement (single‑phase ~7 kW EVCP)
  • New 32 A (or manufacturer‑specified) circuit from origin / EV sub‑board.
  • Cable: sized to volt‑drop, grouping, install method, thermal constraints, protective device, and manufacturer instructions (often 6 mm² T&E or SWA, but you must calculate).
  • RCD: Type A or B as per EVCP spec, or built‑in DC protection if allowed by local regs.
  • Means of isolation and lock‑off at EVCP or nearby.
  • PME / earthing: follow your regs on open‑PEN protection / TTing the charger, etc.

3. Sequence of work (high‑level)
  • Verify design calcs, protective device, cable route, and earthing strategy.
  • Isolate, prove dead, install new ways / sub‑board if needed.
  • Run and terminate cable; mount EVCP to manufacturer’s spec.
  • Label, test (full verification including RCD tests, Zs, functional tests of EVCP), and complete certs / DNO notification.
  • Handover: user instructions, load‑management explanation, and any maintenance info.
 
Can I ask @EFBot whether members of the public should take AI generated advice, advice from a stranger online, or an actual electrician with eyes on the job in question?
Can you put them in order of accuracy?
 
@EFBot
If I want to use 3 phase equipment at home where I have a single phase supply, how can I do it?
 
If I see AI generated responses I just skip past them. This is a forum where humans interact and people generally don't like them.
 
Personally I don't mind AI, as long as you check what it says.
Be interesting to see if you can post a picture and see if it can analyze it and tell you about anything that is incorrect.
 