K

kingeri

I need to extend 17 circuits by about a meter for a CU move. Taking account of ring finals, going from memory there'll be about 20 cables to extend. Was thinking about using an enclosure and DIN rail, with the Line DIN rail connectors. Any advice on doing this? Is this the best way to do it? If so, which actual DIN rail enclosure would you recommend?
 
I will definitely use a DIN rail, been looking on TLC etc. trying to find a suitable and large enough box to take it. Any pointers?
 
an adaptable box with din rail. you can fit your own piece of rail. the line push-in din rail connectors are not something i've used as yet, but i've used the wago ones which are similar. use the gn/y ones for cpc,s as these have extra bits the earth to the din rail.
 
Thanks Tel. Thankfully the job's not til the new year, so got time to source all the bits as cheap as possible!
 
If you're lucky some of the cables will be long enough to just move across and drop in

Failing that, a few labelled up surface patress full of MF joints :)
 
use the gn/y ones for cpc,s as these have extra bits the earth to the din rail.

When I did this, I deliberately didn't use the earth terminals that make electrical connectio to the DIN rail. If you're trying to test final circuits from the DB, then having all your CPCs connected together would not be helpful. eg, testing ring continuity of the CPC will give you a figure of almost zero.
 
I need to extend 17 circuits by about a meter for a CU move. Taking account of ring finals, going from memory there'll be about 20 cables to extend. Was thinking about using an enclosure and DIN rail, with the Line DIN rail connectors. Any advice on doing this? Is this the best way to do it? If so, which actual DIN rail enclosure would you recommend?

Why does it need moving kingeri? It can't be for appearance as you are talking of putting an enclosure in its original position.
 
Get yourself some tape, color coded red black yellow blue and green/ yellow and get twisting ;)
 
What wholesalers have wago/line products on the shelf? I have a similar job myself coming up
 
Why does it need moving kingeri? It can't be for appearance as you are talking of putting an enclosure in its original position.

It's a council job, CUs x2 are virtually level with the ceiling, council inspector has insisted the CU is lowered so occupants (elderly) can reset MCBs. Looks like I'll have around 100 of these to do in the new year, Might get a bit tedious. Funny thing is they really could do with rewiring but council has spent a ton of cash replastering/redecorating/fitting central heating but apparently didn't give the electrics a second thought.
 
It's a council job, CUs x2 are virtually level with the ceiling, council inspector has insisted the CU is lowered so occupants (elderly) can reset MCBs. Looks like I'll have around 100 of these to do in the new year, Might get a bit tedious. Funny thing is they really could do with rewiring but council has spent a ton of cash replastering/redecorating/fitting central heating but apparently didn't give the electrics a second thought.



The council could save money by leaving the consumer unit lid down and showing them a new use for their walking sticks
icon7.png
 

OFFICIAL SPONSORS

Back
Top