All this should have been discussed and agreed before starting work. Although domestic circuits are simple the installation should still be designed correctly including the layout of distribution equipment, cable routes and accessory locations before the first hammer is swung in anger.
 
Which reg no are we thinking of when saying above 1200 in a new builds ?
I know 132.12 and 513.1 but was struggling to find the definitive answer wen I was rushing recently! Cheers
 
Last edited:
So we have agreed to move it to the wall near the front door. I am not particularly happy with having to use joints to extend cables on a new rewire but I am trying to sort this out as best as possible.

Are joints problematic and is it something to worry about in the future? My wife keeps saying is saying going to be substandard wiring so I am just trying to clarify?
 
It is not ideal, but with a late change of plan it is probably the best compromise on cost/time as long as the joints are properly done then it is fine.

The whole joining section needs to be suitably enclosed for physical protection, ideally in a metal box with suitable glands so it has the same fire protection as a metal CU would have.

Also ideally you would want maintenance-free spring loaded style of connectors (e.g. Wago) which are many electrician's first choice anyway, or proper DIN rail mounted screw terminals (they look neat and are widely used in control panels, etc, but they have to remain accessible for testing/inspection).
 
So we have agreed to move it to the wall near the front door. I am not particularly happy with having to use joints to extend cables on a new rewire but I am trying to sort this out as best as possible.

Are joints problematic and is it something to worry about in the future? My wife keeps saying is saying going to be substandard wiring so I am just trying to clarify?

Personally I wouldn't accept any unnecessary joints on a new install.
 
It does sound strange that mr electrician runs the cables back to somewhere he’s not planning to install the CU.
Either newly qualified and doesn’t quite understand the regs concerning new builds and rewires, or he’s trying it on for extra bucks
 
I agree but the electrician will not put it under the stairs and without it can't get anything signed off. Think he may use wago connectors instead

You're the customer, and there is no regulation preventing it from going under the stairs, so he should fit it there if that's where you want it.
 
If he did the wiring why was it routed to below the stairs if he had no intention of fitting the consumer unit there.
Agree. Whilst we are not on site to see the best location for the CU, there should not be the need to have any joints, because this electrician has now decided to relocate it. If the cables are now in the wrong place, electrician should replace cables, free of charge. Seems as he/she has made the error.

OP did not accept joints in cables, your wife is correct in her thinking. The electrician should be doing the rewire correctly, which shouldn’t include unnecessarily jointing cables.
 
Just out of curiosity, at what heights did he put the new sockets and switches?
Someone has already mentioned what the new build heights are, but would be interesting to know if he has put them at that height or where they were before
 