Visible no because it's in a floor void... accessible... that would depend on the missing definition of accessible.
I'd definitely put the gas bond somewhere else if possible. Either further into the house or just outside it, rather than somewhere hard to access. I've bonded at the gas boiler, several meters into the house, where the pipe ran under an upstairs floor.
 
It is most definitely accessible because you will be clamping it there
If nothing changes then it remains accessible :)

Just note its position on the certificate,I believe Nicy have a little box to make such a comment on theirs,if its good enough for nicy its good enough for Nipit
 
Already discussed the other options... can't access the side of the house (the only other means of running front to back due to it only being accessible from a neighbours garden, client doesn't like the idea of involving them, based on the area can't say I blame her - I was going to run externally to avoid internal disruption) and customer doesn't want disturbance in rooms or to the decor, other than where the CU is and immediately above it on a landing where said gas man butchered her floor (oh and no trunking).

When ever I secrete things in the building like this, I always (as you're suggesting @Des 56 ) make the customer aware on plans or with diagrams and by noting it on the cert.

Be a good excuse to use my new toy and print another label for the CU... assuming I can fit it in around the rest of the required labelling :)
 
I will also agree with Handy sparks that it is also worthwhile positioning it where it is visible
Thinking plumber in the future, when he is looking for the bonding and its hidden or just more than 600mm from the meter,it sends them into waves of gas regs panics
 
I will also agree with Handy sparks that it is also worthwhile positioning it where it is visible
Thinking plumber in the future, when he is looking for the bonding and its hidden or just more than 600mm from the meter,it sends them into waves of gas regs panics

Two labels then... no, make that three.... one for the CU, one for the boiler and one for the gas meter cupboard.

Funny thing is they seem bloody quick to disconnect them and not give it a second thought.
 
I will also agree with Handy sparks that it is also worthwhile positioning it where it is visible
Thinking plumber in the future, when he is looking for the bonding and its hidden or just more than 600mm from the meter,it sends them into waves of gas regs panics

In all seriousness, if I could find a nice visible place that was an easy run that did not involve lifting fitted carpets or disrupting the decor, I'd go for it. I looked, and talked through a bunch of options, but it's got to be minimal (i.e. no) disruption anywhere else.

How it's happened is, she's had her meter moved from inside the house (all original lead pipe) to the outside. The clamp is still attached to a piece of the lead pipe hanging down from the ceiling where the meter used to be next to the electricity meter.
 
It is most definitely accessible because you will be clamping it there
If nothing changes then it remains accessible :)

Just note its position on the certificate,I believe Nicy have a little box to make such a comment on theirs,if its good enough for nicy its good enough for Nipit

& a label on the consumer unit
 
They are pretty neat. You can build labels on the PC and transfer them to the printer, so I've got a SparkyChick one with my phone numbers on and my scheme details. Select it, print it and stick it.

Some of the software Brother provide is neat, although I've not had any success getting my Moto G4 to drive it properly, but my iPad... no problem :) Loads of templates for things like patch panels, consumer units, cable flags and stuff.
 