None bloody fitted ! old skool connectors and lec tapethe leads should only reach the fitting's terminal block.
they are one of those dumb sizes .probably fittings that where sold in B&Q in the 80s ! They just wanted a fast option .Be quicker and better to fit new fittings surely? Can be had for £4 a can in jcc. Push fit terminals too, wago box, lamp holder and wagos must come to £3 per time?