LukeD

-
Arms
Supporter
Just bought 20 holders for a 12v-GU10 conversion job. Are they making the leads shorter now ? ! By the time they are enclosed in a Wago box .There is not a lot of cable left !
 
the leads should only reach the fitting's terminal block.
 
Most 'off the shelf' GU10 holders come with about 5 inches of wire

I have seen some GU10 holders with extra long wires but these are usually special order

How much wire is on the ones you bought ?
 
Be quicker and better to fit new fittings surely? Can be had for £4 a can in jcc. Push fit terminals too, wago box, lamp holder and wagos must come to £3 per time?
 
Be quicker and better to fit new fittings surely? Can be had for £4 a can in jcc. Push fit terminals too, wago box, lamp holder and wagos must come to £3 per time?
they are one of those dumb sizes .probably fittings that where sold in B&Q in the 80s ! They just wanted a fast option .
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

LukeD

Arms
Supporter
-
Joined

Thread Information

Title
GU10 lamp holders with LONG leads ?
Prefix
N/A
Forum
Electrical Tools and Products
Start date
Last reply date
Replies
5

Advert

Thread statistics

Created
LukeD,
Last reply from
LukeD,
Replies
5
Views
1,121

Advert

Back
Top