Hi guys, i'm not an electrician ,I'm a builder.

a month ago we had an electrician in first fixing, after he left some capping fell off and i put it back on with a nail. turns out i nicked the cable but it wasnt live until yesterday when he second fixed the outside light and powered on and left. I wasnt on site but later the customers got a shock from the wall several feet from the cable, the whole wall was live , because it was damp from the plastering i had done (like 3 weeks ago) and i nicked the cable. so its all my fault i am told.

Should this not have been picked up on the insulation resistance test?
And why did the electrics not trip? i mean if i put the nail into the cable today would it trip or would the whole wall be live? i got a severe telling off for putting customers lives at risk but builders sometimes damage hidden cables and it always trips and never in my life have i heard of a whole wall being live like this was.

Please post honest opinions. i need to know if its my fault.

thanks
James
 
Hi guys, i'm not an electrician ,I'm a builder.

a month ago we had an electrician in first fixing, after he left some capping fell off and i put it back on with a nail. turns out i nicked the cable but it wasnt live until yesterday when he second fixed the outside light and powered on and left. I wasnt on site but later the customers got a shock from the wall several feet from the cable, the whole wall was live , because it was damp from the plastering i had done (like 3 weeks ago) and i nicked the cable. so its all my fault i am told.

Should this not have been picked up on the insulation resistance test?
And why did the electrics not trip? i mean if i put the nail into the cable today would it trip or would the whole wall be live? i got a severe telling off for putting customers lives at risk but builders sometimes damage hidden cables and it always trips and never in my life have i heard of a whole wall being live like this was.

Please post honest opinions. i need to know if its my fault.

thanks
James
This Electrician that did the first fix, was he the same Electrician who di the 2nd fix and testing and eventually livening up the installation?
 
If the problem only shows with the light in question switched on the fault is between the switched live and earth and if said switch was off [which it shouldn't have been] when he tested it wouldn't have shown up. But regardless it should operate the RCD - unless the nail has severed the CPC and there's no continuity on it back to the CU.
 
In my opinion is a bit of both... you shouldn't of touched it... wasn't your job to do it...

BUT that being said... if I'm not mistaken... if the wall was live that means that under an IR test surely there would of been a very low reading between earth and live... if the current can travel that far through the wall then it can reach the socket/switch iits supplying which will be earthed.... this will be earthed to the wall that is effectively live UNLESS it is not properly earthed.

I can only assume if the wall is still damp after 3 weeks then it is not a stud wall you went old-school and bonded/rendered

Very difficult one this... i could be wrong but from what you have said i think thats right... but never had or heard of this before so good luck!!!

Let us know the outcome
 
Thanks for all the replies guys. I have asked for a copy of the test. awaiting a response. Iput the nail in on the edge of the capping so it would have only been nicked not severed, What is CPC?

The capping was sitting proud of the plasterline because existing bad brickwork on the wall pushed it out from half the height, so i put a nail in on the edge of the capping near the top to hold it in. i couldnt board it so i bonded it with backing plaster then skimmed the whole wall as usual.
 
Thanks for all the replies guys. I have asked for a copy of the test. awaiting a response. Iput the nail in on the edge of the capping so it would have only been nicked not severed, What is CPC?

The capping was sitting proud of the plasterline because existing bad brickwork on the wall pushed it out from half the height, so i put a nail in on the edge of the capping near the top to hold it in. i couldnt board it so i bonded it with backing plaster then skimmed the whole wall as usual.
CPC Circuit Protective Conductor (Earth Wire)
 
A woman was killed when a partition wall was made live by a screw,there was a water leak in that location which conducted it enough that when she bridged herself between this water and a earth source she got electrocuted

I tell you that because the wall may very well have been made live by a nicked cable,testing however may not show anything if the resistance of the wall to the earth source under testing is too high
The person touching the wall along with a better earth source may very well pick up this fault better than a insulation resistance instrument
Even the space shuttle was not immune adequacy of testing during certain circumstances,its unlikely for there to have been be a severe electric shock from that situation
 
Best EV Chargers by Electrical2Go! The official electric vehicle charger supplier.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

Joined
Location
peterborough

Thread Information

Title
Have a major problem
Prefix
N/A
Forum
UK Electrical Forum
Start date
Last reply date
Replies
102
Unsolved
--

Advert

Thread statistics

Created
james stas,
Last reply from
Sparkingmad,
Replies
102
Views
10,289

Advert

Back
Top