bigspark17

-
Arms
Just pondering why hospitals and large commercial sites have many many earth pits sited 1 or 2 meters away from outer walls on corners and on pillars.? Is it to do with lightning protection or are the earthing arrangements tns or tt for these installs.?
 
Lightning pits - usually on a 6m structural grid . It's connected to structural steel column in the wall construction.

1 or 2m is to avoid the large concrete pad foundation that the column is sitting on.
 
When your grouting rods in and it's near impossible to get below 2m ...... Middlesbrough riverside is made of clinker and slag from the steel works.
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Green 2 Go Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses Heating 2 Go
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

bigspark17

Arms
-
Joined
Location
wales
If you're a qualified, trainee, or retired electrician - Which country is it that your work will be / is / was aimed at?
United Kingdom
What type of forum member are you?
Electrical Engineer (Qualified)

Thread Information

Title
Hospital and large commercial earthing arrangements
Prefix
Forum
UK Electrical Forum
Start date
Last reply date
Replies
11
Unsolved
--

Advert

Thread statistics

Created
bigspark17,
Last reply from
Robson689,
Replies
11
Views
3,244

Advert

Back
Top