Be interested in some pictures of your ground source installationsThink PV's bad you should try the paperwork trail for a ground source heat pump!!
This year it was the turn of heat pump as my technology to be given the third degree on. As I had not done a heat pump installation in the last year I had to do a full mis3005 design of an imaginary gshp installation, which was a lot of work.Think PV's bad you should try the paperwork trail for a ground source heat pump!!
Hi All
just had accreditation today 1 non conformity
said that my mutli array on different aspects was not good enough to say
south, east, west,
wants degrees from south.
to do calcs, just have to redo papper work & send in sorted.
Why ? PV and Heat pump installer near me not registered for any technology, selling and installing. RECC not interested.Well done you. We had both RECC and MCS in August.
best advice I can give is to keep paperwork up to date.