Just to jump on this thread, the job I was on yesterday had a dodgy old steel cutout with a hole in the top sealed with insulation tape and the whole lot painted yellow. However the brand new smart meter and isolator were right in the way of the new consumer unit so needed moving, the seal fairy got to work and then they miraculously moved to their new positions, not sure how, I only went out to get a sandwich.

Anyway, what would you do?
 
Just to jump on this thread, the job I was on yesterday had a dodgy old steel cutout with a hole in the top sealed with insulation tape and the whole lot painted yellow. However the brand new smart meter and isolator were right in the way of the new consumer unit so needed moving, the seal fairy got to work and then they miraculously moved to their new positions, not sure how, I only went out to get a sandwich.

Anyway, what would you do?
I would call the relevant authority, of course. :)
 
Thought I'd provide an update on this one as all your expertise and thoughts on my situation were very helpful and confirmed that I was doing the right thing!

Anyway, to cut a long story short I gave up trying to go through the "correct" route and explained the situation directly to NGED using the contact form in their website. The local depot rang and a couple of gents came out to survey back in September and quickly came to the conclusion that the cutout did need replacing.

Just this morning they have visited to do now the work and so now I have a lovely shiny new plastic one! The final twist in the tale was they confirmed that the old did have asbestos in it, so that meter fitter was right all along! 😁

Thanks to you all for your help and expertise.

IMG20231218112303.jpg
 

OFFICIAL SPONSORS

Back
Top