I’ve been offered a full rewire and consumer unit change, in the guidance note it says all notifyable work should be reported to building control or done by a person who is signed upto a competent person scheme. My aim is to sign upto a scheme eventually, I’ve done a domestic installer course and I’m a commercial fire alarm engineer for the last 8 years. How do I build a portfolio of work for a NIC/Napit etc to come and assess without having building control come and check every job? Any feed back would be appreciated. Cheers