Hello all,
I have just been asked by a customer to do a PIR on a commercial property ( portakabin type building, permanent location)
It would seem that there are half a dozen circuits, I have not visited the site yet.
How do you guys price for periodics?? Do you just charge for time or on a per circuit basis.
I have previously priced a job for a previous employer on a per circuit basis, but there was a large No of circuits ( over 15,000) not sure if I would dip out doing it this way...........
I have just been asked by a customer to do a PIR on a commercial property ( portakabin type building, permanent location)
It would seem that there are half a dozen circuits, I have not visited the site yet.
How do you guys price for periodics?? Do you just charge for time or on a per circuit basis.
I have previously priced a job for a previous employer on a per circuit basis, but there was a large No of circuits ( over 15,000) not sure if I would dip out doing it this way...........