I suggest reading GS 38 on to find out what a approved voltage tester is. The re read your post and see if you can see what is wrong with your post.

I can see what's wrong with it, I did mention turning off dp switch and the breaker, I also did mention 'can of worms'.
at the moment they are taking them out with no testing whatsoever
 
tell your tight-arsed employers to pay for a spark to carry out the electrical side of the job instead of penny pinching. let the plumbers stick to what they do best. ........ shifting sh**, slagging everbody off, drowning customers.
 
Blunt saw springs to mind.

No offence intended, but to the O.P what experience / training do you have to prepare S.O.P. (procedures)

totally honest here, never wrote any procedures before, was asked today to 'knock up a sheet for the plumbers', that's why I came on here asking the question.
 
I can see what's wrong with it, I did mention turning off dp switch and the breaker, I also did mention 'can of worms'.
at the moment they are taking them out with no testing whatsoever


So basically your employer has realised the downfall of this and decided they need a scapegoat.

The reason safe isolation procedures suggest using a approved tester is for a reason, not because someone wants to be awkward. Think I may have PDF somewhere stating the correct procedure, I will post it up over the weekend so you can then give it to the plumbers safe in the knowledge it will be done correctly.
 
I can see what's wrong with it, I did mention turning off dp switch and the breaker, I also did mention 'can of worms'.
at the moment they are taking them out with no testing whatsoever

i really don't think you are going to the get the answer you are looking for, if they want a risk assessment/task sheet for this job I would just print them off the safe isolation procedure and them deal with it from there, that is honestly the only way to cover your arse without putting your self in the firing line
 
I can see what's wrong with it, I did mention turning off dp switch and the breaker, I also did mention 'can of worms'.
at the moment they are taking them out with no testing whatsoever

Let them carry on.

Why is it beholden to you to write the procedure? Why, to cover you're employers collective asses!
 
Couple of things don't worry about him connecting it up worry that he will upgrade it from a 7 to 9kw on a 3036 board as this seams to be the standard. Also isolation at the DP switch is a no no as domestic appliance guy got a shock from a cooker because the live connection was welded on at the switch.

One last point a voltage tester remember that they need to test between L-N then L-E then N-E because L-N would have been no good to the domestic appliance guy above
 
So a company big enough to employ 30 plumbers & vans wont spend £30ish on a decent set of fluke volt probes for workers they are legally obliged to protect ?
i'll call a laywer and ambulance for you.
;-)
 
i really don't think you are going to the get the answer you are looking for, if they want a risk assessment/task sheet for this job I would just print them off the safe isolation procedure and them deal with it from there, that is honestly the only way to cover your arse without putting your self in the firing line

i have getting the answer I'm looking for - I'm not writing a procedure. Will let someone else do it, in a couple of weeks time he will have totally forgot that he asked me.
Cheers.
 
Report you boss to the HSE ASAP or get the said plumbers mates to practice their CPR or put 999 on speed dial for medical treatment
 
Is this the housing company with the Italian sounding name?

Untrained personnel isolating and working on unproven conductors is a death wish and no risk assessment or alternative method would satisfy a coroner at an inquest - Don't do it . Simple . They are looking for a scapegoat to aid production and cut costs , I doubt whether an electrician will ever "follow up"
 
a sligtht digression, but the last time i went to a shower that had been changed by a plumber, he'd found the 6mm cable was a tad short to reach the terminal block so he twisted and taped a bit of 2.5mm to the 6mm inside the shower. wondered why the shower wouldn't work a week later with his bodge all welded together and the 30A HRC fuse in the CU blown. muppet.
 
I can't see how this is going to work. Surely the plumbers would have to prove they're competent? at electrics ;)
How quickly behind the plumber does the electrician turn up to carry out the Zs measurement? 1 hour? 1 day? 1 week? Is the shower out of use until tested?
 