This is my longest running job. I took the initial call on Dec 29th on the M25 driving back from visiting relatives at Christmas.
First fixed a rewire in Jan. Then it all stopped. Radio silence. Until about 3 weeks ago ‘we want to be be in for Christmas’ and a plasterer was finally engaged.
Still no boiler, heating only 1st fixed, no kitchen or bathroom.
Lovely people but not the most organised.
It’s been fun trying to remember where all the wires are.