Thank you to all.
As i read on all your thread something its misunderstand .Just place where the shoes and handbag its 200 m square.Not 200x200.Its not like asda.Im qualified electricians buts as i say on the first thread i fix 3 phase board but because of limited experiences on the commercial premises i was bit confused for about 3 phase rcd protected CU.As i understand on all your replay its possible to fix 2 single phase board with rdc as one.Or because of many lighting circuits i can fix one split board just for light and one for other circuits..
Due to limited experiences on the 3 phase system i have a question.In general ( not just on this situation ) if the supply its 3 phase and i need just one phase or two.Can i use that i need and live blank other two or definitely im forced to use three phase..
Thop owner say the drawing its prepare from the architect and i see them its correct..